1st/2nd, 3rd/4th Shift Rail Assembly
Disassemble the shift shaft in the following sequence:
- Rotate the selector pin (5) until opposite the shift links (9)
and (8).
- Remove the 3RD/4TH shift fork (7) with the shift link (8) from
the shift shaft (1).
- Remove the lST/2ND shift fork (10) with the shift link (9) from
the shift shaft (1).
- Remove the roll pin (2) and the computer aided gear select solenoid
lever (3) from the shift shaft (1).
- Remove the interlock plate (6) from the shift shaft (1).
- Remove the selector pin roll pin (4).
- Remove the selector pin (5).
5th/6th, Reverse Shift Rail Assembly
Tools Required
Important: Do not replace the bushings (6) unless inspection shows bushing damage.
Disassemble the shift
shaft in the following sequence:
- Remove the collar roll pin (1).
- Remove the collar (2).
- Remove the 5th/6th shift rail lever (5) from rail (3).
- Remove the 5th/6th shift shaft lever bushings (6), using the J 23907
, and the J 36800
.
- Remove the reverse shift shaft lever roll pin (4).
- Remove the reverse shift rail lever (7) from the shift shaft (3).