- Install a new intake manifold gasket.
- Install the intake manifold.
Notice: Refer to Fastener Notice in the Preface section.
- Install the intake manifold retaining bolt and nuts in the sequence shown.
Tighten
Tighten the intake manifold retaining bolt and nuts to 22 N·m (16 lb ft).
- Install the ground wiring terminal retaining bolt to the intake manifold.
- Install the intake manifold support bracket.
Tighten
Tighten the intake manifold support bracket bolts to the intake manifold and cylinder block to 25 N·m (18 lb ft).
- Install the generator upper bracket.
Tighten
Tighten the generator upper bracket retaining bolts (1) to 25 N·m (18 lb ft) and the bolt (2) to 35 N·m (26 lb ft).
- Install the generator-to-intake manifold strap bracket.
Tighten
Tighten the generator-to-intake manifold strap bracket retaining bolt (3) to 35 N·m (26 lb ft) and the bolt (4) to 25 N·m (18 lb ft).
- Install the fuel rail assembly. Refer to
Fuel Injection Fuel Rail Assembly Replacement
.
Tighten
Tighten the fuel rail assembly retaining bolts to 25 N·m (18 lb ft).
- Install the EVAP emission canister purge solenoid valve.
Tighten
Tighten the evaporative emission canister purge solenoid valve bracket bolt to 5 N·m (44 lb in).
- Connect all of the necessary vacuum lines those were previously disconnected.
- Connect the MAP sensor connector.
- Connect the ETC sensor connector.
- Connect the coolant hoses to the electronic throttle body.
- Connect the air cleaner outlet hose to the electronic throttle body with resonator attached.
- Connect the IAT sensor connector.
- Connect the negative battery cable.
- Refill the engine cooling system. Refer to
Cooling System Draining and Filling
.