Door Check Link Replacement C100/Long Body
Removal Procedure
- Remove the door water deflector. Refer to
Door Water Deflector Replacement.
- Remove the bolts on the door and on the body.
- Remove the door hold-open link.
Installation Procedure
- Install the door hold-open link to the door and the body with the bolts.
Tighten
• | Tighten the door hold-open link-to-body bolt to 20 N·m (15 lb ft). |
• | Tighten the door hold-open link-to-door bolts to 9 N·m (80 lb in). |
Install the door water deflector. Refer to
Door Water Deflector Replacement.
Door Check Link Replacement C105/Short Body
Removal Procedure
- Remove the door water deflector. Refer to
Door Water Deflector Replacement.
- Remove the bolts on the door and on the body.
- Remove the door hold-open link.
Installation Procedure
Notice: Refer to Fastener Notice in the Preface section.
- Install the door hold-open link to the door and the body with the bolts.
Tighten
• | Tighten the door hold-open link-to-body bolt to 20 N·m (15 lb ft). |
• | Tighten the door hold-open link-to-door bolts to 7 N·m (62 lb in). |
- Install the door water deflector. Refer to
Door Water Deflector Replacement.