The 2-3 shift solenoid (SS) valve is a normally-open exhaust valve that, in conjunction with the 1-2 shift solenoid (SS) valve, allows 4 different shifting combinations. Refer to Shift Solenoid Valve State and Gear Ratio . The 2-3 SS valve is attached to the control valve body, within the transmission.
The solenoid receives ignition voltage through the fused power feed circuit. The PCM commands the solenoid ON or OFF by providing a ground path.
When the PCM detects a continuous open, short to ground, or short to voltage in the 2-3 SS valve circuit, then DTC P0758 sets. DTC P0758 is a type A DTC.
• | The ignition switch is in the ON position. |
• | The system voltage is 8-18 volts. |
One of the following conditions occurs for 4.3 seconds:
• | The PCM commands the solenoid ON, and the voltage feedback remains high (B+). |
• | The PCM commands the solenoid OFF, and the voltage feedback remains low (0 volts). |
• | The PCM illuminates the malfunction indicator lamp (MIL). |
• | The PCM commands an immediate landing to 2nd gear. |
• | The PCM commands maximum line pressure. |
• | The PCM inhibits TCC engagement. |
• | The PCM freezes transmission adapt functions. |
• | The PCM records the operating conditions when the Conditions for Setting the DTC are met. The PCM stores this information as Freeze Frame and Failure Records. |
• | The PCM stores DTC P0758 in PCM history. |
• | The PCM turns OFF the MIL during the third consecutive trip in which the diagnostic test runs and passes. |
• | A scan tool can clear the MIL/DTC. |
• | The PCM clears the DTC from PCM history if the vehicle completes 40 warm-up cycles without an emission-related diagnostic fault occurring. |
• | The PCM cancels the DTC default actions when the ignition switch is OFF long enough in order to power down the PCM. |
Ensure the wiring harness is not stretched too tightly or other components are pressing on the connector body. Also, inspect for proper clearance to any other components and wiring. Refer to Testing for Intermittent Conditions and Poor Connections in Wiring Systems.
The numbers below refer to the step numbers on the diagnostic table.
This step tests the electrical operation of the solenoid.
This step verifies the PCMs ability to command the solenoid.
This step verifies that the circuit has the correct resistance.
Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
1 | Did you perform the Powertrain Diagnostic System Check? | -- | Go to Diagnostic System Check - Engine Controls (2.2 L) or Diagnostic System Check - Engine Controls (2.4 L) in Engine Controls | |||||
2 |
Important: Before clearing the DTC, use the Scan Tool in order to record the Freeze Frame and Failure Records. Using the Clear Info function erases the Freeze Frame and Failure Records from the PCM. Is DTC P0753 or P1860 also set? | -- | ||||||
3 |
Refer to Wiring Repairs in Wiring Systems. Did you find the condition? | -- | ||||||
4 |
Important: The condition that affects this circuit may exist in other connecting branches of the circuit. Refer to Power Distribution Schematics in Wiring Systems for complete circuit distribution. Test the ignition 1 voltage circuit (CKT 439) of the 2-3 SS valve for a short to ground between the fuse block and the AT inline 20-way connector. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | ||||||
5 |
Important: The condition that affects this circuit may exist in other connecting branches of the circuit. Refer to Power Distribution Schematics in Wiring Systems for complete circuit distribution. Test the ignition 1 voltage circuit (CKT 839) of the 2-3 SS valve for a short to ground between the AT inline 20-way connector and the 2-3 SS valve. Refer to Circuit Testing in Wiring Systems. Did you find the condition? | -- | -- | |||||
6 | Test the ignition 1 voltage circuit (CKT 439) of the 2-3 SS valve for an open between the fuse block and the AT inline 20-way connector. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | ||||||
7 | Test the ignition 1 voltage circuit (CKT 839) of the 2-3 SS valve for an open between the AT inline 20-way connector and the 2-3 SS valve. Refer to Circuit Testing in Wiring Systems. Did you find the condition? | -- | -- | |||||
Does the solenoid click when commanded ON and OFF? | -- | Go to Intermittent Conditions (2.2 L) or Intermittent Conditions (2.4 L) in Engine Controls | ||||||
Refer to Automatic Transmission Inline Harness Connector End View . Is the test lamp ON when you command the solenoid ON, and OFF when you command the solenoid OFF? | -- | |||||||
10 | Is the test lamp always ON? | -- | ||||||
11 |
Is the test lamp ON? | -- | ||||||
12 | Test the control circuit (CKT 1223) of the 2-3 SS valve for a short to ground between the PCM connector C2 and the AT inline 20-way connector. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | -- | |||||
13 | Is the test lamp always OFF? | -- | -- | |||||
14 | Test the control circuit (CKT 1223) of the 2-3 SS valve for an open between the PCM connector C2 and the AT inline 20-way connector. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | ||||||
15 | Connect a test lamp from terminal B of the J 44152 to ground. Refer to Automatic Transmission Inline Harness Connector End View . Is the test lamp ON? | -- | ||||||
16 | Test the control circuit (CKT 1223) of the 2-3 SS valve for a short to voltage between the PCM connector C2 and the AT inline 20-way connector. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | -- | |||||
Refer to Automatic Transmission Inline Harness Connector End View . Is the resistance within the specified range? | 19-31 ohms | |||||||
18 | Is the resistance greater than the specified value? | 31 ohms | ||||||
19 |
Refer to Circuit Testing in Wiring Systems. Did you find a condition? | -- | ||||||
20 | Measure the resistance from terminal B of the J 44152 to ground. Refer to Automatic Transmission Inline Harness Connector End View . Is the resistance less than the specified value? | 1000 ohms | ||||||
21 | Test the control circuit (CKT 1223) of the 2-3 SS valve for a short to ground between the AT inline 20-way connector and the 2-3 SS valve. Refer to Circuit Testing in Wiring Systems. Did you find the condition? | -- | -- | |||||
22 | Measure the resistance between terminal B and all other terminals, except terminals A, E and T, of the J 44152 . Refer to Automatic Transmission Inline Harness Connector End View . Is the resistance between terminal B and any other terminal, except terminals A, E and T, less than the specified value? | 1000 ohms | ||||||
23 | Replace the automatic transmission wiring harness. Refer to Transmission Overhaul in Transmission Unit Repair Manual. Did you complete the replacement? | -- | -- | |||||
24 | Replace the 2-3 SS valve. Refer to Control and Shift Solenoids Replacement. Did you complete the replacement? | -- | -- | |||||
25 | Replace the PCM. Refer to Powertrain Control Module Replacement (2.2 L) or Powertrain Control Module Replacement (2.4 L) in Engine Controls. Did you complete the replacement? | -- | -- | |||||
26 | Perform the following procedure in order to verify the repair:
Has the test run and passed? | -- | System OK |