Important: Do not reuse the transfer tubes. Always install new transfer tubes.
Important: Do not use a tool to pry the EBCM or the BPMV.
Important: Do not reuse the EBCM mounting bolts (1). Always install new bolts.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the three Allen bolts to 8 N·m (6 lb ft),
then to 16 N·m (12 lb ft).
Important: Do not use RTV or any other type of sealant on the EBCM gasket or mating surfaces.
Important: Do not reuse the old mounting bolts. Always install new bolts with the new EBCM.
Tighten
Tighten the four bolts to 5 N·m (39 lb in)
in an X-pattern.
Tighten
Tighten the three bolts to 9 N·m (7 lb ft).
Tighten
Tighten the bolts to 12 N·m (9 lb ft).
Tighten
Tighten the three brake pipe fittings to 30 N·m (22 lb ft).
Tighten
Tighten the three brake pipe fittings to 30 N·m (22 lb ft).
Important: Verify that the combination valve metering rod is depressed during bleeding.