Oxidation Catalytic Converter for Chevrolet Chevy C Pickup - 2WD 1996
Oxidation Catalytic Converter 6.5L Diesel, All
Removal Procedure
- Raise the vehicle.
- Remove the U-bolts from the rear of the oxidation catalytic converter
assembly.
- Remove the nuts and washers from the front flange.
- Remove the oxidation catalytic converter from the front of the
exhaust pipe and the intermediate exhaust pipe.
- Remove the oxidation catalytic converter assembly.
Installation Procedure
- Install the new oxidation catalytic converter to the front exhaust pipe and
the intermediate exhaust pipe.
- Install the new U-bolt at the rear of the oxidation
catalytic converter.
Tighten
Tighten the nuts to 40 N·m (29 lb ft).
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install a new flange gasket and the flange washers and nuts.
Tighten
Tighten the flange nuts to 48 N·m (35 lb ft).
- Check for clearance and alignment.
- Lower the vehicle.