GM Service Manual Online
For 1990-2009 cars only

Launch Shudder/Vibration on Acceleration (Replace Propeller Shaft and InstallNew Pinion Flange/Seal)

Subject:Launch Shudder/Vibration on Acceleration (Replace Propeller Shaft and Install New Pinion Flange/Seal)

Models:1999-2003 Chevrolet Silverado 2WD 1500 Series Extended Cab Short Box Pickups
1999-2003 GMC Sierra 2WD 1500 Series Extended Cab Short Box Pickups
With 4L60-E Automatic Transmission (RPO M30)
Except QUADRASTEERâ„¢ (RPO NYS) Equipped Vehicles



This bulletin is being revised to add Model information. Please discard Corporate Bulletin Number 02-04-17-001 (Section 04 -- Driveline Axle).


Important: Implementation of this Service Bulletin by "GM of Canada" dealers requires prior District Service Manager approval.

Condition

Some customers may comment on a vibration when accelerating from a stop. This is also known as launch shudder. This condition may occur between 0-40 km/h (0-25 mph) and be more noticeable when the vehicle is carrying cargo or used for towing.

Correction

A new propeller shaft, P/N 15071486, has been developed to correct this condition. The new propeller shaft incorporates dual double cardan joints on the center and rear joint positions. Refer to Corporate Bulletin Number 02-00-90-002 for lubrication information.

The new propeller shaft will require the installation of a new pinion flange kit, P/N 15071485. The pinion flange kit consists of the following components:

    • A pinion flange
    • Hex bolts (four)
    • A pinion seal
    • A rear axle drive pinion nut

Replace the propeller shaft with the new propeller shaft using the following procedure. Use the part numbers listed below.

  1. Remove the propeller shaft assembly and the center bearing. Refer to the applicable Propeller Shaft Replacement procedure in the Propeller Shaft sub-section of the Service Information (SI).
  2. Important: In step 2, you must measure the pinion and differential preload. This information is needed to set the preload of the new pinion flange to the correct specification and to reduce any rear axle noise concerns.

  3. Remove the drive pinion yoke and the pinion oil seal. Refer to the Drive Pinion Flange/Yoke and/or Oil Seal Replacement procedure in the Rear Drive Axle sub-section of the Service Information (SI).
  4. Important: In step 3, use this procedure as a guideline to install the pinion flange to the drive pinion and to set up the proper pinion bearing preload.

  5. Install the new pinion oil seal, the new pinion flange and the new drive pinion nut. Refer to the Drive Pinion Flange/Yoke and/or Oil Seal Replacement procedure in the Rear Drive Axle sub-section of the Service Information (SI).
  6. Install the new propeller shaft assembly and the new center bearing. Refer to the applicable Propeller Shaft Replacement procedure in the Propeller Shaft sub-section of the Service Information (SI).
  7. Tighten

        • Tighten the propeller shaft flange bolts to 70 N·m (52 lb ft).
        • Tighten the center bearing support nuts to 40 N·m (30 lb ft).
  8. After completing the repair, operate the vehicle in order to verify that the condition has been corrected.

Parts Information

Part Number

Description

Qty

15071486

Shaft Asm-Frt & Rr Prop

1

15071485

Flange Asm Service Kit-Rr Prop Shf

1

*12479002

Flange Asm, Pinion

1

*9441504

Bolt, Rr Prop Shf

4

*26064028

Seal, Pinion

1

*9783762

Nut, Rr Drv Axle Pinion

1

*Parts are included in Flange Kit P/N 15071485.

Parts are currently available from GMSPO.

Warranty Information

For vehicles repaired under warranty, use:

Labor Operation

Description

Labor Time

F2043

Flange, Pinion Shaft - Replace

1.5 hrs

Add

To replace two-piece prop shaft

0.2 hr