Important: Shimming may be needed at the lower vertical bracket to achieve proper horizontal height with the hood.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the new tow hook studs to 60 N·m44 lb ft.
Tighten
Tighten the center support tubes to 9 N·m12 lb ft.
Tighten
Tighten the L-bracket nuts and bolts to 31 N·m23 lb ft.
Tighten
Tighten the side guard nuts and bolts to 40 N·m30 lb ft.