- Install the J 41798
to the engine.
Tighten
• | Tighten the M8 bolts to 25 N·m (18 lb ft). |
• | Tighten the M10 bolts to 50 N·m (37 lb ft). |
- Install an engine hoist to the J 41798
.
- Remove the engine from the engine stand.
- Install the engine to the vehicle.
- Align the engine and transmission.
- Install the left and right engine mount
to engine mount bracket bolts.
Tighten
Tighten the bolts to 65 N·m (48 lb ft).
- Install the upper transmission bolts until snug.
- Remove the floor jack from under the transmission.
- Remove the engine hoist.
- Remove the J 41798
from the engine.
- Install the ignition coil(s) and the spark
plug wire(s). Refer to
Ignition Coil Replacement
in Engine Controls-4.8L, 5.3L and 6.0L.
- Raise the vehicle.
- Install the disc and clutch pressure plate
and bolts until snug, if equipped.
- Using J 5824-A
,
align the clutch disc splines with the pilot bearing.
- Align the marks made during removal.
- Tighten the clutch pressure plate bolts
in the sequence shown, evenly over 3 increments with the fourth increment to
the final specification.
Tighten
Tighten the bolts to 70 N·m (52 lb ft).
- Install the clutch line to the concentric
slave cylinder.
- Install the manual transmission bolt/studs,
if equipped.
- Install
the manual transmission stud on the right side of the transmission, if equipped.
Tighten
Tighten the bolt/studs to 50 N·m (37 lb ft).
- Remove the J 21366
from the transmission.
- Install the automatic transmission, if equipped.
- If equipped with a 4L80E transmission, install
the transmission converter cover bolts.
- If equipped with a 4L60E transmission, install
the transmission bolt and stud on the right side.
Tighten
Tighten the bolts/studs to 50 N·m (37 lb ft).
- Install the automatic transmission oil level
indicator tube, if equipped.
- Install the automatic transmission oil level
indicator tube nut, if equipped.
Tighten
Tighten to nut to 18 N·m (13 lb ft).
- Install the torque converter bolts, if equipped.
Tighten
• | If equipped with a 4L60E, tighten the bolts to 63 N·m (47 lb ft) |
• | If equipped with a 4L80E, tighten the bolts to 60 N·m (44 lb ft). |
- Install the positive cable clip and bolt.
Tighten
Tighten the bolt to 9 N·m (80 lb in).
- Install the catalytic converter. Refer to
Catalytic Converter Replacement
in Engine Exhaust.
- Install the starter motor. Refer to
Starter Motor Replacement
in Engine Electrical.
- Install the oil pan skid plate and bolts,
if equipped.
Tighten
Tighten the bolts to 20 N·m (15 lb ft).
- Install
the engine shield and bolts.
Tighten
Tighten the bolts to 20 N·m (15 lb ft).
- Lower the vehicle.
- Install
the vacuum brake booster hose.
- Position the generator bracket to the front
of the engine.
- Install the generator bracket bolts until snug.
- Install the rear power steering pump to engine block bolt, until snug.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Route the engine wiring harness to the lower engine area.
- Raise the vehicle.
- Slide the channel pin into the oil pan tab.
- Install the battery cable channel bolt.
Tighten
Tighten the bolt to 12 N·m (106 lb in).
- Connect the following electrical connectors:
• | Engine oil level sensor (6) |
• | Coolant heater, if equipped. |
- Lower the vehicle.
- Connect the fuel pipes. Refer to
Metal Collar Quick Connect Fitting Service
in Engine Controls-4.8L, 5.3L
and 6.0L.
- Install the EVAP purge solenoid vent tube
to the solenoid (1).
- Install the EVAP tube to the vapor pipe (2).
- Install the battery cable junction block
to the junction block bracket.
- Clip all of the engine wiring harness clips to their correct location.
- Connect the following electrical connectors:
• | Oil pressure sensor (1) |
- Position the harness ground and the engine ground strap to the block.
- Install the harness ground bolt at the left rear of the engine block.
- Position the harness ground, and auxiliary negative battery cable, if
equipped, to the block.
- Install the harness ground bolt at the right rear of the engine block.
Tighten
Tighten the bolts to 16 N·m (12 lb ft).
- Connect the following electrical connectors:
• | Electronic variable orifice switch (2) |
- Position the harness ground and negative battery cable to the block.
- Install the harness ground bolt.
Tighten
Tighten the bolt to 25 N·m (18 lb ft).
- Connect the MAP sensor (1) and knock
sensor (2) electrical connectors.
- Connect the following electrical connectors:
- Connect the main coil harness (2)
and fuel injector electrical connectors on the left side.
- Install
the generator cable to the generator; perform the following:
59.1. | Install the generator cable. |
59.2. | Install the generator cable nut to the terminal stud. |
Tighten
Tighten the nut to 9 N·m (80 lb in).
59.3. | Slide the boot over the terminal stud. |
- Install the radiator vent inlet hose to
the throttle body.
- Position the vent inlet hose clamp at the throttle body.
- Install the engine wiring harness bracket
and nut (2)
Tighten
Tighten the nut to 5 N·m (44 lb in).
- Connect the following electrical connector:
• | EVAP canister purge solenoid (1) |
- Install the heater hoses. Refer to
Heater Inlet Hose Replacement
and
Heater Outlet Hose Replacement
in Heating, Ventilation and Air Conditioning.
- Open the hose clamp and install the radiator
outlet hose to the water pump.
- Open the hose clamp and install the radiator
inlet hose to the water pump.
- Install the radiator support. Refer to
Radiator Support Replacement
in Body Front End.
- Install the A/C compressor. Refer to
Air Conditioning Compressor Replacement
in HVAC Systems-Manual.
- Remove the hood hinge bolts from the service position (2).
- Lower the hood to the normal position.
- Install the hood hinge bolts.
Tighten
Tighten the bolts to 25 N·m (18 lb ft).
- Remove the fender covers.
- Fill the crankcase with the proper quantity and grade of engine oil. Refer
to
Approximate Fluid Capacities
or
Fluid and Lubricant Recommendations
in Maintenance and
Lubrication.
- Bleed the hydraulic clutch, if equipped. Refer to
Hydraulic Clutch Bleeding
in Clutch.
- Perform the CKP system variation learn procedure. Refer to
Crankshaft Position System Variation Learn
in Engine Controls-4.8L,
5.3L, and 6.0L.
Important: After an overhaul, the engine should be tested. Use the following procedure
after the engine is install in the vehicle.
- Test the vehicle using the following procedure:
76.1. | Disable the ignition system. |
76.2. | Crank the engine several times. Listen for any unusual noises or evidence
that parts are binding. |
76.3. | Enable the ignition system. |
76.4. | Start the engine and listen for unusual noises. |
76.5. | Check the vehicle oil pressure gage or light and confirm that the engine
has acceptable oil pressure. |
76.6. | Run the engine speed at about 1000 RPM until the engine has reached
normal operating temperature. |
76.7. | Listen for sticking lifters and other unusual noises. |
76.8. | Inspect for fuel, oil and/or coolant leaks while the engine is running. |
76.9. | Perform a final inspection for the proper engine oil an coolant levels. |
- Install the engine shield. Refer to
Upper Intake Manifold Sight Shield Replacement
.
- Close the hood.