GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


    Object Number: 660465  Size: SH
  1. Remove the turbocharger. Refer to Turbocharger Replacement .
  2. Remove the right fuel rail. Refer to Fuel Injection Fuel Rail Assembly Replacement - Bank 1 in Engine Controls - 6.6 L.
  3. Remove the intake manifold tube. Refer to Intake Manifold Tube Replacement
  4. Remove the intake manifold bolts/nuts.
  5. Important: The intake manifold uses sealer. Pry at the area by the fuel rail bolt holes in order to avoid damage to the sealing surfaces.

  6. Remove the intake manifold.
  7. To prevent entry of debris in the cylinder head tape the openings.
  8. If required, clean and inspect the intake manifold. Refer to Intake Manifold Cleaning and Inspection .

Installation Procedure


    Object Number: 663817  Size: SH
  1. Apply a 2-3 mm (1/8 in) wide, by 0.5-1.5 mm (1/16 in) high bead of sealant GM P/N 97720043 (Canadian P/N 88901148), or equivalent to the intake manifold.

  2. Object Number: 660465  Size: SH
  3. Install the intake manifold.
  4. Install the intake manifold bolts/nuts.

  5. Object Number: 654532  Size: SH

    Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  6. Tighten the intake manifold bolts/nuts in the sequence shown.
  7. Tighten
    Tighten the bolts/nuts to 21 N·m (15 lb ft).

  8. Install the intake manifold tube. Refer to Intake Manifold Tube Replacement .
  9. Install the right fuel rail. Refer to Fuel Injection Fuel Rail Assembly Replacement - Bank 2 in Engine Controls - 6.6 L.
  10. Install the turbocharger. Refer to Turbocharger Replacement .