Tools Required
• | J 8520 Cam Lobe
Lift Indicator Set |
- Assemble the J 8520
by attaching the threaded rod and the
dial indicator holder to one of the bolt holes on the transmission case.
- Assemble the J 8001-3
onto the dial indicator holder. Index the J 8001-3
to the end of the turbine shaft (502).
- Eliminate any slack by pressing down on the turbine shaft (502).
- Apply upward pressure on the output carrier with the J 28585
.
- Set the J 8001-3
to
0.
- Pull up on the turbine shaft (502) while holding up the output
carrier with the J 28585
.
The correct end play is between 0.102-0.559 mm (0.004-0.022 in).
- Record this measurement for future reference.
- Remove the tools.