GM Service Manual Online
For 1990-2009 cars only

Shift Lever Replacement - On Vehicle Without Tow/Haul Switch

Removal Procedure


    Object Number: 362445  Size: SH
  1. Roll back the seal until the TORX® head screw (2) is exposed.
  2. Remove the TORX® head screw (2).
  3. Remove the shift lever (1).

Installation Procedure


  1. Object Number: 362445  Size: SH
  2. Install the shift lever (1).
  3. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  4. Install the TORX® head screw (2).
  5. Tighten
    Tighten the screw to 22 N·m (16 lb ft).

  6. Roll the seal over the TORX® head screw (2).

Shift Lever Replacement - On Vehicle With Tow/Haul Switch

Removal Procedure

    Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.


    Object Number: 362445  Size: SH
  1. Disconnect the negative battery.
  2. Disable the supplemental inflatable restraint (SIR) system. Refer to Disabling the SIR System in SIR.
  3. Remove the 2 TORX® head screws from the lower column cover.
  4. Remove the lower column cover.
  5. Roll back the seal on the shift lever (1) until the TORX® head screw (2) is exposed.
  6. Remove the TORX® head screw (2).
  7. Remove the shift lever wiring from the retainer clips.
  8. Remove the wiring from the electrical connector.
  9. Remove the shift lever (1).

Installation Procedure


    Object Number: 362445  Size: SH
  1. Install the shift lever.
  2. Connect the wiring to the electrical connector.
  3. Install the wiring on the retainer clips.
  4. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  5. Install the TORX® head screw.
  6. Tighten
    Tighten the screw to 22 N·m (16 lb ft).

  7. Roll the seal over the TORX® head screw.
  8. Install the lower column cover.
  9. Install the 2 TORX head screws to the lower column cover.
  10. Tighten
    Tighten the screw to 3 N·m (25 lb in).

  11. Enable the SIR system. Refer to Enabling the SIR System in SIR.
  12. Connect the negative battery cable.
  13. Perform the Idle Learn Procedure for 4.8L, 5.3L and 6.0L engines only. Refer to PCM Idle Learn Procedure in Engine Controls-4.8L, 5.3L and 6.0L.