- Install the inside collar into the rotor.
- Install the rotor into the drive end frame.
- Install the following components onto the rotor shaft:
• | The generator shaft nut |
Tighten
The nut to 100 N·m (74 lb ft).
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the bearing into the slip ring end frame from the outside,
until the bearing is flush with the outside shoulder of the slip ring end
frame.
Important: In order to insure proper operation of the unit, install the slip ring
end frame components in the correct order.
- Install the rectifier bridge.
Important: Install the capacitor with the insulator material resting against the
drive end frame.
- Install the capacitor.
- Install the washers.
Important: Ensure that the insulated bolt, that is at the capacitor/rectifier bridge,
attaches the capacitor strap and the rectifier bridge to the slip ring end
frame. Ensure that the metal side of the capacitor strap is against the regulator
connection.
- Install the bolts.
- Install the brushes onto the brush holder with the retaining pin.
- Install the dust shield onto the brush holder.
- Install the following components into the slip ring end frame as one
unit:
- Tap the plastic retaining pin on the dust shield into the retaining
clip. Ensure that the brush retaining pin goes through the access hole to
the outside of the slip ring end frame for removal after the generator is
assembled.
- Install the regulator bolt.
- Install the brush holder bolt.
- Assemble the connector strap to the voltage regulator solder clip.
Assemble the brush holder connection to the other voltage regulator solder
clip.
Notice: Avoid excessive heat when soldering connections, as this can cause voltage
regulator damage.
- Crimp, then solder, the voltage regulator connections.
- Place the stator terminals over the rectifier bridge terminals in order to
assemble the stator.
- Install the stator lead nuts.
- Assemble the slip ring and drive end frames.
Note the scribe marks.
- Install the slip ring end bearing outer race into the bearing
well in the slip ring end frame casting.
- Install the through bolts.
- Remove the retaining pin in order to release the brushes against
the slip rings.