Removal Procedure
Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
Caution: Sectioning should be performed only in the recommended areas. Failure to do
so may compromise the structural integrity of the vehicle and cause personal injury
if the vehicle is in a collision.
- Disable the SIR system. Refer to
SIR Disabling and Enabling
.
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Remove all related panels and components.
- Repair as much of the damage as possible. Refer to
Dimensions - Body
.
- Remove the sealers and anti-corrosion materials from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair
.
Important: Note the number and location of the factory welds for installation of the front compartment upper side rail.
- Locate and drill out all the necessary factory welds.
- Measure forward 225 mm (8 7/8 in) (a) of the center of the forward hood hinge attachment bolt hole location. Mark the location.
- Using the mark made in the previous step as a starting point, use a sliding square to transfer a line on the top, side, and bottom of the rail.
- Cut the side upper rail at the marked location.
- Remove the front portion of the side upper rail.
- Drill two 8-mm (5/16-in) plug weld holes 10 mm (1/2 in) rearward from the edge of the top, bottom, and outer side on the front edge of the remaining portion of the side upper rail on the vehicle.
Installation Procedure
- Measure on the service part 200 mm (7 7/8 in) (a) forward of the hood hinge attachment bolt hole location. Mark the section.
- Using the mark made in the previous step as a starting point, use a sliding square to transfer a line on the top, side, and bottom of the rail.
- Cut the service part at the marked location.
Important: If the location of the original plug weld holes can not be determined, space the plug weld holes every 40 mm (1½ in) apart.
- Drill 8 mm (5/16 in) plug weld holes as necessary in the locations noted on the original panel.
- Prepare all mating surfaces as necessary.
- Apply GM-approved Weld-Thru Coating or equivalent to all mating surfaces. Refer to
Anti-Corrosion Treatment and Repair
.
- Measure 25 mm (1 in) forward from the cut area. Mark the location on top of the rail.
- Using the mark made in the previous step as a starting point, use a sliding square to transfer a line on the top, side, and bottom of the rail.
Important: Do not cut past the scribed line.
- At the weld flange areas of the rail and at each radius, cut toward the scribed line. This will aid in the flange-forming process.
- Bend the cut area of the rail inward to create a 25 mm (1 in) step flange for the weld joint.
Important: Flanges on the service part will slide inside the rail portion of the vehicle.
- Position the side upper rail to the vehicle using 3-dimensional measuring equipment. Clamp the rail in place.
- Stitch and plug weld accordingly.
- Clean and prepare all of the welded surfaces.
- Install all of the related panels and components.
- Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair
.
- Paint the repaired area. Refer to
Basecoat/Clearcoat Paint Systems
.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Enable the SIR system. Refer to
SIR Disabling and Enabling
.