Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
DEFINITION: The voltmeter is indicating abnormal voltage readings. The Instrument Panel Cluster (IPC) monitors Ignition 1 voltage at the IPC connector terminal A13. If the voltage reading at the IPC terminal A13 falls out of the normal range, the IPC should inform the driver by illuminating across the Driver's Information Center either the LOW VOLTAGE or HIGH VOLTAGE warning message. If PCM fault codes P0562 or P0563 exist, diagnose those first before proceeding with this table. Always ensure that a good battery is installed in the vehicle, charging system operation depends heavily on the battery condition. | ||||
1 | Were you sent here from the Charging System Check? | -- | Go to Charging System Check | |
2 | Load test the battery. Does the battery pass the load test? | -- | ||
3 |
Does the battery pass the load test? | -- | ||
4 | Replace the battery. Is the repair complete? | -- | Go to Charging System Check | -- |
5 |
Is the voltage within the specified values? | 10.0-14.0V | ||
6 |
Are the voltage readings within 0.1 to 1.5 volts of each other? | -- | ||
7 | Replace the instrument panel cluster (IPC). Is the repair complete? | -- | Go to Charging System Check | -- |
8 | Check the IPC MiniFuse #19 fuse for an open circuit. Is this fuse open? | -- | ||
9 | Repair a short to ground in CKT 139 between the IPC and the instrument panel electrical center. Is the repair complete? | -- | Go to Charging System Check | -- |
10 | Repair the open or high resistance in CKT 139 between the IPC and the instrument panel electrical center. Is the repair complete? | -- | Go to Charging System Check | -- |
11 |
Is the voltage within the specified values? | 10.0-14.0V | ||
12 | Check the fusible link located down at the starter motor between the medium gauge blue wire (CKT 2) and the heavy gauge red wire (CKT 2). See wiring schematic for further detail. Is the fusible link open? | -- | ||
13 | Repair a short to ground in CKT 2 (13 red wire) between the generator BATTERY terminal and the fusible link. Is the repair complete? | -- | Go to Charging System Check | -- |
14 | Repair an open in CKT 1 (19 red wire), CKT 2 (3 blue wire) or CKT 2 (13 red wire) between the generator BATTERY terminal and the positive battery terminal. See wiring schematic for further detail. Is the repair complete? | -- | Go to Charging System Check | -- |
15 |
Is the voltage within the specified values? | 10.0-14.0V | ||
16 | Check the fusible link located down at the starter motor between the small gauge grey wire (CKT 2) and the medium gauge red wire (CKT 2). See wiring schematic for further detail. Is the fusible link open? | -- | ||
17 | Repair a short to ground in CKT 2 (1 red wire) between the generator connector terminal D and the fusible link. Is the repair complete? | -- | Go to Charging System Check | -- |
18 | Repair an open in CKT 1 (19 red wire), CKT 2 (0.5 grey wire) or CKT 2 (1 red wire) between the generator connector terminal D and the positive battery terminal. See wiring schematic for further detail. Is the repair complete? | -- | Go to Charging System Check | -- |
19 |
Is CKT 23 continuous between the generator connector and the powertrain control module connector C2? | -- | ||
20 |
Is CKT 23 shorted to ground? | -- | ||
21 |
Is CKT 23 shorted to battery power? | -- | ||
22 | Repair the open in CKT 23 between the generator connector and the powertrain control module connector C2. Is the repair complete? | -- | Go to Charging System Check | -- |
23 | Repair the short to ground in CKT 23 between the generator connector and the powertrain control module connector C2. Is the repair complete? | -- | Go to Charging System Check | -- |
24 | Repair the short to battery power in CKT 23 between the generator connector and the powertrain control module connector C2. Is the repair complete? | -- | Go to Charging System Check | -- |
25 |
Is CKT 225 continuous between the generator connector and the powertrain control module connector C2? | -- | ||
26 |
Is CKT 225 shorted to ground? | -- | ||
27 |
Is CKT 225 shorted to battery power? | -- | ||
28 | Repair the open in CKT 225 between the generator connector and the powertrain control module connector C2. Is the repair complete? | -- | Go to Charging System Check | -- |
29 | Repair the short to ground in CKT 225 between the generator connector and the powertrain control module connector C2. Is the repair complete? | -- | Go to Charging System Check | -- |
30 | Repair the short to battery power in CKT 225 between the generator connector and the powertrain control module connector C2. Is the repair complete? | -- | Go to Charging System Check | -- |
31 | Replace the generator. Is the repair complete? | -- | Go to Charging System Check | -- |