Daytime Running Lamps Inoperative (Canada)
Step
| Action
| Value(s)
| Yes
| No
|
1
| Were you sent hear from the DRL System Check?
| --
|
Go to Step 2
| Go to DRL System Check
|
2
|
- Disconnect the DRL Control Module connectors C1 and C2.
- Turn the ignition switch to the ON position.
- Connect a DMM between the DRL Control Module connector C2 terminal
C and ground.
- Measure the voltage at the DRL Control Module connector C2 terminal
C.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 7
|
Go to Step
3
|
3
| Check the CR CONT MiniFuse® #20 for an open.
Is the CR CONT MiniFuse® #20 open?
| --
|
Go to Step 4
|
Go to Step
5
|
4
| Repair a short to the ground in CKT 1239.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
5
|
- Remove the CR CONT MiniFuse® #20.
- Connect a DMM between the instrument panel electrical center terminal
A which is used for the CR CONT MiniFuse® #20 and ground.
- Measure the voltage at terminal A.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 6
| Refer to Power Distribution
|
6
| Repair a
poor connection or an open in CKT 1239.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
7
|
- Connect a DMM between the DRL Control Module connector C2 terminal
F and ground.
- Measure the voltage at the DRL Control Module connector C2 terminal
F.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 12
|
Go to Step
8
|
8
| Check the BCM 13 MiniFuse® #6 for an open.
Is the fuse open?
| --
|
Go to Step 9
|
Go to Step 10
|
9
| Repair a
short to ground in CKT 141.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
10
|
- Remove the BCM 13 MiniFuse® #6.
- Connect a DMM between the instrument panel electrical center terminal
A which is used for the BCM 13 MiniFuse® #6 and ground.
- Measure the voltage at terminal A.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 11
| Refer to Power Distribution
|
11
| Repair a
poor connection or an open in CKT 141.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
12
|
- Connect a DMM between the DRL Control Module connector C2 terminal
A and ground.
- Measure the continuity between the DRL Control Module connector
C2 terminal A and ground.
Is CKT 150 continuous to ground?
| --
|
Go to Step
14
|
Go to Step 13
|
13
| Repair an open in CKT 150 between the DRL Control Module connector C2
terminal A and G201.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
14
|
- Connect a DMM between the DRL Control Module connector C2 terminals
E and F.
- Measure the voltage at the DRL Control Module connector C2 terminals
E and F.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 15
|
Go to Step
18
|
15
|
- Keep the DMM connected between the DRL Control Module connector
C2 terminals E and F.
- Disconnect the park brake switch connector.
- Measure the voltage at the DRL Control Module connector C2 terminals
E and F.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 16
|
Go to Step
17
|
16
| Repair a short to ground in CKT 33.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
17
| Replace the Park
Brake Switch.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
18
|
- Connect a DMM between the DRL Control Module connector C1 terminals
D and ground.
- Measure the voltage at the DRL Control Module connector C1 terminal
D.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 25
|
Go to Step
19
|
19
|
- Remove the HDLP Circuit Breaker #53.
- Connect a DMM between the instrument panel electrical center terminal
A which is used for the HDLP Circuit Breaker #53 and ground.
- Measure the voltage at terminal A.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 20
| Refer to Power Distribution
|
20
| Connect a
fused jumper (20 A) between the instrument panel electrical center terminal
A and terminal B which is used for the HDLP Circuit Breaker #53.
Does the 20 A fuse within the fused jumper immediately show an open
circuit?
| --
|
Go to Step 21
|
Go to Step 22
|
21
| Repair a
short to ground in CKT 842 or CKT 103.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
22
|
- Leave the fused jumper (20 A) in place between the instrument
panel electrical center terminal A and terminal B which is used for the HDLP
Circuit Breaker #53.
- Connect a DMM between the DRL Control Module connector C1 terminal
D and ground.
- Measure the voltage at the DRL Control Module connector C1 terminal
D.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 23
|
Go to Step
24
|
23
| Replace the HDLP Circuit Breaker #53.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
24
| Repair the open
in CKT 842.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
25
|
- Reconnect both DRL Control Module connectors C1 and C2.
- Turn the ignition switch to the ON position.
- Backprobe the DRL Control Module connector C1 terminal F with
the positive lead from a DMM.
- Connect the negative lead of the DMM to ground.
- Measure the voltage at the DRL Control Module connector C1 terminal
F.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 27
|
Go to Step
26
|
26
| Replace the DRL Control Module.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
27
|
- Disconnect the headlamp opening door actuator control module connector
C1.
- Turn the ignition switch to the ON position.
- Connect a DMM between the headlamp opening door actuator control
module connector C1 terminal A and ground.
- Measure the voltage at the headlamp opening door actuator control
module connector C1 terminal A.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 28
|
Go to Step
29
|
28
| Replace the headlamp opening door actuator control module.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
29
| Repair the open
in CKT 103.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
Daytime Running Lights Inoperative (Domestic/Export)
Step
| Action
| Value(s)
| Yes
| No
|
1
| Were you sent hear from the DRL
System Check?
| --
|
Go to Step 2
| Go
to DRL System Check
|
2
| Perform the BCM Diagnostic System Check.
Are any DTCs stored in memory?
| --
| Go to the applicable DTC table
|
Go to Step 3
|
3
| Are both the LH and RH turn/park lamps inoperative during
Daytime Running Lamps (DRL) operational mode?
| --
|
Go to Step 32
|
Go to Step
4
|
4
| Is just the RH turn/park lamp inoperative during DRL operational
mode?
| --
|
Go to Step 6
|
Go to Step 5
|
5
| Is just the
LH turn/park lamp inoperative during DRL operational mode?
| --
|
Go to Step 19
| Go to DRL System Check
|
6
|
- Remove the DRL R Micro Relay #38 from the instrument panel electrical
center.
- Connect a DMM between ground and the BAT terminal inside the instrument
panel electrical center which is used for the DRL R Micro Relay #38.
- Measure the voltage at the BAT terminal in the instrument panel
electrical center which is used for the DRL R Micro Relay #38.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 8
|
Go to Step
7
|
7
| Replace the instrument panel electrical center.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
8
| Connect a fused
jumper (10 A) between the CKT 1315 terminal and the BAT terminal of the instrument
panel electrical center which is used for the DRL R Micro Relay #38.
Does the RH turn/park illuminate?
| --
|
Go to Step
10
|
Go to Step 9
|
9
|
- Leave the fused jumper (10 A) in place.
- Remove the RH turn/park lamp from its socket.
- Connect a DMM between the RH turn/park lamp socket terminal A
and ground.
- Measure the voltage at terminal A.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 15
|
Go to Step
18
|
10
|
- Reinstall the DRL R Micro Relay #38 back into the instrument panel
electrical center.
- Disconnect the BCM connector C2.
- Connect a fused jumper (10 A) between the BCM connector C2 terminal
D16 and ground.
Does the RH turn/park lamp illuminate?
| --
|
Go to Step 11
|
Go to Step
12
|
11
| Replace the BCM.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
12
|
- Remove the DRL R Micro Relay #38 from the instrument panel electrical
center.
- Connect a DMM between the CKT 1966 terminal in the instrument
panel electrical center which is used for the DRL R Micro Relay #38 and the
BCM connector C2 terminal D16.
- Measure CKT 1966 for continuity between the CKT 1966 terminal
in the instrument panel electrical center which is used for the DRL R Micro
Relay #38 and the BCM connector C2 terminal D16.
Is CKT 1966 continuous between these two terminals?
| --
|
Go to Step 13
|
Go to Step
14
|
13
| Replace the DRL R Micro Relay #38.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
14
| Repair the open
in CKT 1966.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
15
|
- Connect the DMM between the RH turn/park lamp socket terminal
G and ground.
- Measure for continuity between the RH turn/park lamp socket terminal
G and ground.
Is the CKT 150 continuous to ground?
| --
|
Go to Step 17
|
Go to Step
16
|
16
| Repair an open in CKT 150 between the RH turn/park lamp
socket terminal G and G102.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
17
| Replace the RH turn/park
lamp.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
18
| Repair an open in
CKT 1315 between the instrument panel electrical center and the RH turn/park
lamp.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
19
|
- Remove the DRL L Micro Relay #40 from the instrument panel electrical
center.
- Connect a DMM between ground and the BAT terminal in the instrument
panel electrical center which is used for the DRL L Micro Relay #40.
- Measure the voltage at the BAT terminal in the instrument panel
electrical center which is used for the DRL L Micro Relay #40.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 21
|
Go to Step
20
|
20
| Replace the instrument panel electrical center.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
21
| Connect a fused
jumper (10 A) between the CKT 1314 terminal and the BAT terminal in the instrument
panel electrical center which is used for the DRL L Micro Relay #40.
Does the LH turn/park illuminate?
| --
|
Go to Step
23
|
Go to Step 22
|
22
|
- Leave the fused jumper (10 A) in place.
- Remove the LH turn/park lamp from its socket.
- Connect a DMM between the LH turn/park lamp socket terminal A
and ground.
- Measure the voltage at terminal A.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 28
|
Go to Step
31
|
23
|
- Reinstall the DRL L Micro Relay #40 back into the instrument panel
electrical center.
- Disconnect the BCM connector C3.
- Connect a fused jumper (10 A) between the BCM connector C3 terminal
A7 and ground.
Does the LH turn/park lamp illuminate?
| --
|
Go to Step 24
|
Go to Step
25
|
24
| Replace the BCM.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
25
|
- Remove the DRL L Micro Relay #40 from the instrument panel electrical
center.
- Connect a DMM between the CKT 1976 terminal in the instrument
panel electrical center which is used for the DRL L Micro Relay #40 and the
BCM connector C3 terminal A7.
- Measure CKT 1976 for continuity between the CKT 1976 terminal
in the instrument panel electrical center which is used for the DRL L Micro
Relay #40 and the BCM connector C3 terminal A7.
Is CKT 1976 continuous between these two terminals?
| --
|
Go to Step 26
|
Go to Step
27
|
26
| Replace the DRL 7 Micro Relay #40.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
27
| Repair the open
in CKT 1976.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
28
|
- Connect the DMM between the LH turn/park lamp socket terminal
G and ground.
- Measure for continuity between the LH turn/park lamp socket terminal
G and ground.
Is the CKT 150 continuous to ground?
| --
|
Go to Step 30
|
Go to Step
29
|
29
| Repair an open in CKT 150 between the LH turn/park lamp
socket terminal G and G102.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
30
| Replace the LH turn/park
lamp.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
31
| Repair an open in
CKT 1314 between the instrument panel electrical center and the LH turn/park
lamp.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
32
|
- Remove the APPROACH Minifuse® #2.
- Connect a DMM between the instrument panel electrical center terminal
A9 which is used for the APPROACH Minifuse® #2 and ground.
- Measure the voltage at terminal A9.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 33
| Refer to Power Distribution
|
33
| Connect a
fused jumper (20 A) between the instrument panel electrical center terminal
A9 and terminal B9 which is used for the APPROACH Minifuse® #2.
Does the 20 A fuse within the fused jumper immediately show an open
circuit?
| --
|
Go to Step 34
|
Go to Step 35
|
34
| Repair a
short to ground in CKT 2740.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
35
|
- Leave the fused jumper (20 A) in place between the instrument
panel electrical center terminal A9 and terminal B9 which is used for the
APPROACH Minifuse® #2.
- Disconnect the instrument panel electrical center connector C1.
- Connect a DMM between the instrument panel electrical center connector
C1 terminal A9 and ground.
- Measure the voltage at the instrument panel electrical center
connector C1 terminal A9.
Is the voltage within the specified values?
| 10.0-14.0V
|
Go to Step 36
|
Go to Step
37
|
36
| Replace the instrument panel electrical center.
Is the repair complete?
| --
| Go to DRL System Check
| --
|
37
| Repair the open
in CKT 2740.
Is the repair complete?
| --
| Go to DRL System Check
| --
|