Tools Required
J 29803-A ISO Flaring
Kit
Caution: Always use double walled steel brake pipe when replacing brake pipes.
The use of any other pipe is not recommended and may cause brake system failure.
Carefully route and retain replacement brake pipes. Always use the correct
fasteners and the original location for replacement brake pipes. Failure to
properly route and retain brake pipes may cause damage to the brake pipes
and cause brake system failure.
- Obtain
the recommended tubing and steel fitting nuts of the correct size. Outside diameter
tubing is used in order to specify the size.
- Cut the tubing to length. In order to determine the correct length, measure
the old pipe using a string and adding 3 mm (1/8 in) for each
ISO flare.
- Before starting the flare, install the fittings on the tubing.
- Chamfer the inside and outside diameter of the pipe with the de-burring
tool.
- Remove all traces of lubricant from the brake pipe and the flaring tool.
- Clamp the flaring tool body in a vise.
- Select the correct size collet and forming mandrel (3) for the pipe
size used.
- Insert the proper forming mandrel into the tool body.
- While holding the mandrel in place with a finger, thread the forcing
screw until the screw makes contact with the forming mandrel and begins to
move the forming mandrel.
- When contact is made with the forming mandrel, turn the forcing screw
back one complete turn.
- Slide the clamping nut (1) over the brake pipe into the correct collet.
Leave approximately 19 mm (¾ in) of tubing extending out
the collet.
- Insert the collet into the tool body. The brake pipe end must contact
the face of the forming mandrel.
- Tighten the clamping nut securely into the tool body in order to avoid
forcing the brake pipe out.
- Wrench tighten the forcing screw until the screw bottoms. Do not over
tighten the forcing screw or the flare may become over-sized.
- Back the clamping nut out of the tool body.
- Disassemble the clamping nut and collet. The flare is now ready for use.
- Bend the pipe to match the old pipe. Maintain a clearance of 19 mm
(3/4 in) for all moving or vibrating components.