Measure the resistance across the level sender with tank upright. Should read empty tank.
Roll tank over. Resistance should read full stop.
Return tank to upright position. Ensure proper empty stop resistance. This is done to ensure the level sender operates freely inside the tank and is not hung up on any of the internal lines.