Folding Top Replacement Manual Top
Removal Procedure
- Position the number 1 bow and the number 5 bow in an up position.
- Open top stowage compartment lid.
- Remove the lock pillar upper trim panel. Refer to
Body Lock Pillar Trim Panel Replacement
- Disconnect the rear defogger electrical connections at the seat belt tower.
- Remove pivot bracket brace.
- Remove the folding top pivot bracket bolts with an assistant.
- With an assistant, slide the top slightly up and then rearward and out of the pillar bracket pin.
Installation Procedure
- With an assistant, position the folded top to the vehicle with the top pivot bracket resting on the pillar bracket pin.
- Ailing bolt holes by inserting a drift pin in the alignment hole (1).
- Install pivot bracket brace.
- Install the pivot bracket bolts.
Notice: Refer to Fastener Notice in the Preface section.
- Install the folding top bolts to the body in the mandatory sequence 1, 2, 3.
Tighten
Tighten the bolts to 25 N·m (18 lb ft).
- Connect the rear defogger electrical connections.
- Close and latch the top.
- Install the lock pillar trim panel. Refer to
Body Lock Pillar Trim Panel Replacement
.
- Check top for proper operation.
- Water test the folding top.
Folding Top Replacement Power Top
Removal Procedure
Important: The power folding top is serviced as a complete assembly. Folding top cover, frame, hydraulic pump and folding top control module are all included in the service part assembly.
- Position the #1 bow and the #5 bow in an up position.
- Open the folding top stowage lid.
- Disconnect the battery. Refer to
Battery Negative Cable Disconnection and Connection.
- Remove the stowage compartment carpet. Refer to
Rear Compartment Rear Center Trim Panel Carpet Replacement.
- Disconnect the rear defogger electrical connections at the seat belt tower.
- Disconnect the electrical connector from the hydraulic pump bracket.
- Disconnect the stowage lid hydraulic cylinders from the hinge. Refer to
Folding Top Cylinder Replacement .
- Open the fold-over clips (1) that retain the electrical harness and hydraulic hoses to the floor.
- Remove folding top control module. Refer to
Folding Top Control Module Replacement .
- Remove the hydraulic pump nuts (1).
- Remove the folding top pillar bracket bolts with an assistant.
- With an assistant, slide the top slightly up and then rearward and out of the pivot bracket.
- Remove the folding top assembly.
Installation Procedure
- With an assistant, position the folded top to the vehicle with the top resting on the pivot bracket pin.
- Insert a drift pin into the alignment hole (1) to align bolt holes.
- Remove the drift pin.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the folding top bolts to the body in the mandatory sequence 1,2,3.
Tighten
Tighten the bolts to 25 N·m (18 lb ft).
- Install the hydraulic pump nuts (1).
Tighten
Tighten the nuts to 10 N·m (89 lb in).
- Install the folding top control module. Refer to
Folding Top Control Module Replacement .
- Install the folding top stowage lid hydraulic cylinders. Refer to
Folding Top Cylinder Replacement .
- Install the electrical harness and hydraulic hose fold-over clips (1) to the floor. Fold the clips over to retain the electrical harness and hydraulic hoses.
- Connect the electrical connector to the hydraulic pump.
- Connect the rear defogger electrical connections.
- Install the rear compartment carpet. Refer to
Rear Compartment Rear Center Trim Panel Carpet Replacement.
- Connect the battery. Refer to
Battery Negative Cable Disconnection and Connection.
- Close and latch the top.
- Inspect the top for proper operation. Refer to
Power Folding Top Description and Operation .
- Water test the folding top.