Tools Required
J 5403 Snap Ring Pliers
- Coat all the O-rings with clean polyalkaline glycol (PAG) oil.
- Push the control valve in place using thumb pressure.
- Use the J 5403
to install
the valve retaining ring. The high point of the curved sides must be against the valve
housing. Be sure the retaining ring is properly seated in the ring groove.
- Evacuate and recharge the A/C system. Refer to
Refrigerant Recovery and Recharging
.