Generator Replacement LNJ
Removal Procedure
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Remove the drive belt. Refer to
Drive Belt Replacement
.
- Disconnect the engine wiring harness electrical connector (1) from the generator.
- Reposition the engine wiring harness boot (4).
- Remove the generator terminal nut (2).
- Remove the engine wiring harness terminal lead (3) from the generator.
- Remove the generator bolts (1).
- Remove the generator (2).
Installation Procedure
- Install the generator (2).
Notice: Refer to Fastener Notice in the Preface section.
- Install the generator bolts (1).
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the engine wiring harness terminal lead (3) to the generator.
- Install the generator terminal nut (2).
Tighten
Tighten the nut to 20 N·m (15 lb ft).
- Position the engine wiring harness boot (4).
- Connect the engine wiring harness electrical connector (1) to the generator.
- Install the drive belt. Refer to
Drive Belt Replacement
.
- Install the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
Generator Replacement LY7
Removal Procedure
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Remove the drive belt. Refer to
Drive Belt Replacement
.
- Disconnect the engine wiring harness electrical connector (1) from the generator.
- Reposition the generator wiring harness boot (1) at the generator terminal.
- Remove the generator wiring harness nut (3) from the generator.
- Remove the generator wiring harness (2) terminal from the generator.
- Remove the idler pulley (3). Refer to
Drive Belt Idler Pulley Replacement
.
- Remove the generator bolts (1).
Important: When removing the generator from the vehicle, it may be necessary to maneuver the generator to remove it from the vehicle.
- Remove the generator (2).
Installation Procedure
- Position the generator (2) to the engine.
- Loosely install the generator bolts (1).
- Install the idler pulley (3). Refer to
Drive Belt Idler Pulley Replacement
.
Notice: Refer to Fastener Notice in the Preface section.
- Tighten the generator bolts.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the generator wiring harness (2) terminal to the generator.
- Install the generator wiring harness nut (3) to the generator.
Tighten
Tighten the nut to 20 N·m (15 lb ft).
- Position the generator wiring harness boot (1) at the generator terminal.
- Connect the engine wiring harness electrical connector (1) to the generator.
- Install the drive belt. Refer to
Drive Belt Replacement
.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.