Exhaust Muffler Replacement LY7
Removal Procedure
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
.
- Loosen the exhaust muffler clamps (1).
- With the aid of an assistant, separate the rubber insulators from the exhaust pipe hangers.
- With the aid of an assistant, remove the muffler assembly (1) from exhaust flexible pipe and the vehicle.
Installation Procedure
- With the aid of an assistant, install the muffler assembly (1) to the vehicle and the exhaust flexible pipe.
- With the aid of an assistant, install the exhaust pipe hangers to the rubber insulators.
Notice: Refer to Fastener Notice in the Preface section.
- Tighten the exhaust muffler clamps (1).
Tighten
Tighten the clamps to 5 N·m (44 lb in).
- Lower the vehicle.
Exhaust Muffler Replacement LNJ
Removal Procedure
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
.
- Remove the catalytic converter pipe flange to muffler pipe flange nuts.
- With the aid of an assistant, separate the rubber insulators (5, 6, and 7) from the exhaust pipe hangers (1, 2, and 3).
- With the aid of an assistant, remove the muffler assembly (3) from catalytic converter (1) and the vehicle.
Installation Procedure
- With the aid of an assistant, install the muffler assembly (3) to catalytic converter (1) and the vehicle.
- With the aid of an assistant, install the rubber insulators (5, 6, and 7) to the exhaust pipe hangers (1, 2, and 3).
- Install a NEW catalytic converter to muffler gasket onto the studs.
Notice: Refer to Fastener Notice in the Preface section.
- Install the catalytic converter pipe flange to muffler pipe flange nuts.
Tighten
Tighten the nuts to 37 N·m (27 lb ft).
- Lower the vehicle.