This repair procedure includes an installation procedure for either metal-inert gas welding or adhesive bonding.
Warning: Refer to Approved Equipment for Collision Repair Warning in the Preface section.
Note: When replacing panels that involve servicing of stationary windows, refer to Adhesive Installation of Encapsulated Stationary Windows before performing any priming or refinishing.
Important: If the location of the original plug weld holes can not be determined, or if structural weld-thru adhesive is present, space the plug weld holes every 40 mm (1½ in) apart.