Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Backup Lights System Check performed? | -- | Go to Step 2 | Go to Backup Lamp System Check |
2 | Is the left backup lamp operative? | -- | Go to Step 10 | Go to Step 3 |
3 |
Is continuity present? | -- | Go to Step 5 | Go to Step 4 |
4 | Repair the open in CKT 150 (BLK) between the left backup lamp and ground G400. Is the left backup lamp operative? | -- | Go to Step 9 | Go to Step 5 |
5 |
Is continuity present? | -- | Go to Step 6 | Go to Step 8 |
6 |
Is the left backup lamp operative? | -- | Go to Step 9 | Go to Step 7 |
7 | Replace the left backup lamp socket. Is the left backup lamp operative? | -- | Go to Step 9 | Go to Step 8 |
8 | Repair the open in CKT 24 (LT GRN) between splice S409 and the left backup lamp. Are both of the backup lamps operative? | -- | Go to Backup Lamp System Check | Go to Step 10 |
9 | Is the right backup lamp operative? | -- | Go to Backup Lamp System Check | Go to Step 10 |
10 |
Is continuity present? | -- | Go to Step 12 | Go to Step 11 |
11 | Repair the open in CKT 250 (BLK) between the right backup lamp and ground G401. Is the right backup lamp operative? | -- | Go to Backup Lamp System Check | Go to Step 12 |
12 |
Is continuity present? | -- | Go to Step 13 | Go to Step 15 |
13 |
Is the right backup lamp operative? | -- | Go to Backup Lamp System Check | Go to Step 14 |
14 | Replace the right backup lamp socket. Is the right backup lamp operative? | -- | Go to Backup Lamp System Check | Go to Step 15 |
15 | Repair the open in CKT 24 (LT GRN) between splice S409 and the right backup lamp. Is the right backup lamp operative? | -- | Go to Backup Lamp System Check | -- |