The purpose of New Product Information is to highlight, or indicate, important product changes from the previous model year.
Changes may include 1 or more of the following items:
• | Torque values and/or fastener tightening strategies |
• | Changed engine specifications |
• | New sealants and/or adhesives |
• | Disassembly and assembly procedure revisions |
• | Engine mechanical diagnostic procedure revisions |
• | New special tools required |
• | A component comparison from the previous year |
Changed engine Specifications
No changes for 2009.
Torque Values and/or Fastener Tightening Strategies
• | All fasteners and threaded holes on the LY2, LMF, and LY6 engines utilize metric threads. |
• | Certain fasteners should not be used again. Bolts, studs, or other fasteners that must be replaced, will be called out in the specific service procedure. |
New Sealants and/or Adhesives
Sealers and adhesives, as required, are identified within the specific service procedures. Refer to
Adhesives, Fluids, Lubricants, and Sealers.
Disassembly and Assembly Procedure Revisions
No changes for 2009.
Engine Mechanical Diagnostic Procedure Revisions
Diagnosis on a vehicle should follow a logical process. Strategy based diagnostics is a uniform approach for repairing all systems. The diagnostic flow may always be used in order to resolve a system condition. The diagnostic flow is the place to start
when repairs are necessary. For a detailed explanation, refer to
Diagnostic Starting Point - Engine Mechanical.
New Special Tools Required
Front cover alignment tool
EN-48853 tool
is used to align the front cover during the installation procedure.
A Component Comparison from the Previous Year
Second design engines will use a rivet-type plug replacing the coolant air bleed covers located at the top rear of each cylinder head. To properly repair a leaking plug, remove cylinder head from the engine, remove the plug from the cylinder head and install
first design coolant air bleed cover and bolt.