Install the 4 LH and RH core support bolts (1) and tighten to
25 N·m (18 lb ft).
Position the positive battery to underhood bused electrical center (UBEC) cable to the junction block and install the nut then tighten to
8 N·m (71 lb in).
Position the auxiliary positive cable to the junction block and install the nut then tighten to
8 N·m (71 lb in).
Position the positive battery cable to the junction block and install the nut then tighten to
8 N·m (71 lb in).
Reposition and connect the hood release cable to the hood release latch.
Connect the wiring harness electrical connector at the UBEC.
Position the LH fender to core support brace and install the bolts.
Position the wiring ground to the LH fender and install the bolt and tighten to
9 N·m (80 lb in).
Position the RH fender to core support brace and install the bolts.
Position the wiring ground to the RH fender and install the bolt and tighten to
9 N·m (80 lb in).
Connect the suction hose (4) to the air conditioning (A/C) compressor.
Install the suction hose bolt (1) to the A/C compressor and tighten to
16 N·m (12 lb ft).
Position the evaporator to condenser hose to the condenser.
Install the evaporator to condenser hose nut (1) and tighten to
16 N·m (12 lb ft).
Position the transmission cooler line to the auxiliary transmission cooler and install the retaining clip.
Position the upper transmission cooler line to the radiator and install the retaining clip.
Lower the vehicle.
Position the radiator outlet hose to radiator and install the retaining clip.
Connect the radiator inlet hose to the radiator.
Using the
J 38185 , reposition the radiator inlet hose clamp.