GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

    Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.

    Caution: Sectioning should be performed only in the recommended areas. Failure to do so may compromise the structural integrity of the vehicle and cause personal injury if the vehicle is in a collision.

  1. Disable the SIR system. Refer to SIR Disabling and Enabling .
  2. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .

  3. Object Number: 1581819  Size: SH
  4. Remove all of the related panels and the components.
  5. Remove the sealers and anti-corrosion materials from the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair .
  6. Repair as much of the damage as possible to factory specifications. Refer to Dimensions - Body .

  7. Object Number: 867581  Size: SH
  8. Locate the die marks on the inner and outer halves of the front rail.

  9. Object Number: 867583  Size: SH

    Important: Do not section the rail except where indicated.

  10. Measure forward of the straight line shown on the die marks 7 mm (¼ in). Mark the rail at both die mark locations.

  11. Object Number: 2015888  Size: SH
  12. At the marks made forward of the die marks, align a sliding square or similar tool to the bottom side of the front rail. Scribe a line 360 degrees around the frame rail, 7 mm (¼ in) forward of the die marks (1).

  13. Object Number: 1581820  Size: SH
  14. Cut the rail at the marked location.

  15. Object Number: 1581822  Size: SH
  16. Remove the damaged component from the vehicle.

Installation Procedure


    Object Number: 867590  Size: SH
  1. Cut the upper and lower inner and outer corners of the frame rail. Cut at the beginning and the end of the radius at each corner rearward 7 mm (¼ in) to the scribe line.
  2. Bend each side of the rail inward by aligning a vice grip flanging tool or similar tool to the scribe line. Bend a 7 mm (¼ in) flange inward slightly. This flange is the welding backer.

  3. Object Number: 867591  Size: SH
  4. Prepare the sectioning weld area as necessary for welding.

  5. Object Number: 867585  Size: SH
  6. Locate the die marks on the service part front rail.
  7. Scribe a line completely around the service rail at the line in the die mark by aligning a sliding square or similar tool to the bottom edge of the front rail service part.

  8. Object Number: 2015895  Size: SH
  9. Cut at the marked location. Remove the front portion of the rail.
  10. Prepare the cut edge of the front rail section for welding.
  11. Apply 3M Weld-Thru Coating P/N 05916 or equivalent to all mating surfaces.

  12. Object Number: 1581822  Size: SH
  13. Position the front rail section using 3-dimensional measuring equipment. Clamp the service part in place.

  14. Object Number: 876346  Size: SH
  15. Tack weld the part into position.
  16. Inspect the service rail for proper dimensions using 3-dimensional measuring equipment.
  17. Stitch weld along the entire sectioning joint. Make 25 mm (1 in) welds along the seam with 25 mm (1 in) gaps between.
  18. Complete the stitch weld.
  19. Clean and prepare the welded surfaces.
  20. Install all of the related panels and components.
  21. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair .
  22. Paint the repaired area. Refer to Anti-Corrosion Treatment and Repair .
  23. Enable the SIR system. Refer to SIR Disabling and Enabling .
  24. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .