Callout | Component Name |
---|---|
Preliminary Procedure
| |
1 | Instrument Panel Tie Bar Assembly to HVAC Module Bolts (Qty: 3) Notice: Refer to Fastener Notice in the Preface section. Tighten |
2 | Instrument Panel Tie Bar Assembly to Body Bolts (Qty: 6) Tighten |
3 | Instrument Panel Tie Bar Assembly to HVAC Module Nut (Qty: 1) Tighten |
4 | Instrument Panel Tie Bar Assembly Tip
|