Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Fog Lights Schematics | |||
1 | Did you perform the Lighting System Diagnostic System Check? | Go to Step 2 | |
2 |
Do the backup lamps turn ON? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 |
Does the test lamp illuminate? | Go to Step 4 | Go to Step 8 |
4 | Connect a fused jumper across the switched side of the backup lamps relay at the RH I/P accessory wiring junction block. Do the backup lamps turn on? | Go to Step 7 | Go to Step 5 |
5 | Test for a short to ground in the backup lamps supply voltage circuit. Refer to Circuit Testing and to Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 9 | Go to Step 6 |
6 | Repair a high resistance or an open in the backup lamps supply voltage circuit. Refer to Circuit Testing and to Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 9 | -- |
7 | Replace the backup lamp relay. Refer to Relay Replacement in Wiring Systems. Did you complete the replacement? | Go to Step 9 | -- |
8 | Replace the RH I/P fuse block. Refer to Instrument Panel Electrical Center or Junction Block Replacement - Right Side in Wiring Systems. Did you complete the replacement? | Go to Step 9 | -- |
9 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |