Removal Procedure
- Remove the catalytic converter. Refer to
Catalytic Converter Replacement.
- Remove the secondary air injection (AIR) shutoff/check valve nuts (1).
- Remove the AIR pipe bolts (1).
- Remove the AIR pipe, heat shield, and gaskets. Discard the gaskets.
- Remove the heat shield from the AIR pipe.
Installation Procedure
- Position the heat shield to the AIR pipe, and install one middle AIR pipe bolt to the pipe
- Install NEW AIR pipe gaskets to the studs and the bolt.
- Position and install the AIR pipe.
Caution: Refer to Fastener Caution in the Preface section.
- Install the remaining AIR pipe bolts (1).
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Install the AIR shutoff/check valve nuts (1).
Tighten
Tighten the nuts to 10 N·m (89 lb in).
- Install the catalytic converter. Refer to
Catalytic Converter Replacement.