GM Service Manual Online
For 1990-2009 cars only

Tools Required

    • J 8614-01 Flange and Pulley Holding Tool
    • J 23907 Slide Hammer with Bearing Adapter
    • J 36825 Output Shaft Oil Seal Remover - 4WD Models Only
    • J 44707 T-Bar Push Puller
    • J 44725 Gear Pack Assembly Fixture
    • J 44726 2/3 Jaw Puller
    • J 44730 Intermediate Case Puller Legs

    Object Number: 661219  Size: SH
  1. Remove the drain plug and drain the transmission fluid.

  2. Object Number: 661221  Size: SH
  3. Position the transmission on the floor with the output shaft up. Use boards in order to allow for the protrusion of the input shaft.
  4. If the transmission is equipped with a power take-off (PTO), remove the PTO.

  5. Object Number: 661223  Size: SH
  6. Remove the shift control housing bolts.
  7. Remove the shift control housing assembly.

  8. Object Number: 727452  Size: SH
  9. For RWD transmission, using the J 8614-01 , loosen the propeller shaft yoke nut.

  10. Object Number: 661231  Size: SH
  11. For RWD transmission, remove the propeller shaft yoke nut and discard.
  12. Remove the propeller shaft yoke.

  13. Object Number: 661234  Size: SH
  14. Remove the shift shaft detent sleeve and the shift shaft detent plunger.

  15. Object Number: 663712  Size: SH

    Notice:  Do not nick, scratch or damage the sealing surface. The sealing surface is a machined surface. Damage to the machined surface can cause leakage.

  16. If RWD, remove the vehicle speed sensor (VSS) bolt and washer.
  17. Remove the VSS and O-ring seal.
  18. Remove and discard the O-ring seal.

  19. Object Number: 661233  Size: SH
  20. Remove the 19 bolts retaining the rear case to the front case.

  21. Object Number: 661236  Size: SH

    Important: Do not separate the rear case from the intermediate case by using a pry bar between the cases. The cases have machined sealing surfaces.

  22. Remove the rear case.
  23. • Use a soft-face hammer and hit up on the rear case.
    • The cases should come apart once the sealer is broken.
    • There are 2 dowel pins that may bind in the rear case.
    • The mainshaft rear bearing is a slip fit in the rear case and may bind if the case is not lifted up straight.

    Object Number: 661237  Size: SH
  24. Remove the 2 bolts for the intermediate case.

  25. Object Number: 661238  Size: SH
  26. Install the S-hooks in the webbing of the intermediate case to the locations shown.
  27. Attach a suitable chain to the S-hooks.


    Object Number: 661239  Size: SH
  28. Using a suitable lifting device, carefully remove the gear assembly from the front case.

  29. Object Number: 661249  Size: SH

    Important: The weight of the gear assembly is extended over the edge of the workbench. The weight may tip over or overload a standard metal workbench.

  30. Secure the J 44725  (1) to a sturdy workbench.
  31. Position the gear assembly on the J 44725 .

  32. Object Number: 661258  Size: SH

    Notice: When removing the roll pins from the shift shafts use a punch that is a slightly smaller diameter than the roll pin. Flaring of the shift shaft groove may occur if the punch binds. This will result in extra effort to remove the shift forks or shift control levers. When double roll pins are used, remove both of the roll pins at the same time. Support the shift component when removing the roll pins to prevent damage to the shift shafts. Do not reuse the roll pins after removal.

  33. Using a hammer and punch, remove the roll pins from the internal shift control rear lever.

  34. Object Number: 661975  Size: SH
  35. Remove the internal shift control rear lever.

  36. Object Number: 661262  Size: SH
  37. Using a hammer and a punch, remove the roll pins for the internal shift control front lever.

  38. Object Number: 662001  Size: SH
  39. Remove the internal shift control front lever.
  40. 23.1. Turn the internal shift control front lever in order to clear the 2nd/3rd shift fork and the 4th/5th shift fork.
    23.2. Remove the shift shaft with the internal shift control front lever.

    Object Number: 661994  Size: SH
  41. Using the J 36825  (1) and the J 23907  (2), remove the 4 shift shaft detent plugs.

  42. Object Number: 661996  Size: SH

    Important: Only remove the plungers as needed for replacement.

  43. Remove the shift shaft detent springs and the shift shaft detent plungers. The plungers should only be removed if replacing the plungers. The plungers may be hard to come out now. After removing the shift shafts, the plungers will be easier to remove.

  44. Object Number: 663682  Size: SH

    Notice: When removing the roll pins from the shift shafts use a punch that is a slightly smaller diameter than the roll pin. Flaring of the shift shaft groove may occur if the punch binds. This will result in extra effort to remove the shift forks or shift control levers. When double roll pins are used, remove both of the roll pins at the same time. Support the shift component when removing the roll pins to prevent damage to the shift shafts. Do not reuse the roll pins after removal.

    Important: The 4th/5th shift fork and the 2nd/3rd shift fork do not require removal from the shift shafts for transmission disassembly. Do not remove the roll pins from the 4th/5th shift fork and the 2nd/3rd shift fork unless replacing the shift forks or the shift shafts.

  45. Remove the following roll pins:
  46. • The 6th gear shift fork (1)
    • The 1st/reverse gear shift fork (2)

    Object Number: 662003  Size: SH
  47. Remove the 6th gear shift fork and shaft.
  48. 27.1. Move the interlock plate in the 6th gear position by moving the plate toward the 1st/reverse shift shaft.
    27.2. Pull up on the shift shaft while tapping down on the shift fork with a soft-face hammer.
    27.3. Remove the shift fork and shaft from the 6th gear synchronizer assembly.

    Object Number: 662004  Size: SH
  49. Remove the 1st/reverse shift fork and shaft.
  50. 28.1. Move the interlock plate in the reverse gear shift position by moving the plate toward the 6th gear shift shaft.
    28.2. Pull up on the shift shaft while tapping down on the shift fork with a soft-face hammer.
    28.3. Remove the shift fork and shaft from the 1st/reverse gear synchronizer hub.

    Object Number: 722214  Size: SH
  51. If 4WD, remove the retaining ring for the mainshaft rear bearing.

  52. Object Number: 662005  Size: SH
  53. Using the J 44726 , remove the gears from the mainshaft.

  54. Object Number: 662006  Size: MH
  55. Remove the following components from the mainshaft:
  56. 31.1. The speed sensor reluctor wheel, RWD only (1)
    31.2. The mainshaft rear bearing (2)
    31.3. The reverse gear thrust washer (3)
    31.4. The reverse gear (4)
    31.5. The reverse gear bearings (5)
    31.6. The reverse gear bushing (6)
    31.7. The reverse gear synchronizer blocking ring (7)
    31.8. The 1st/reverse synchronizer assembly (8)
    31.9. The 1st gear synchronizer blocking ring (9)
    31.10. The 1st gear (10)
    31.11. The 1st gear bearings (11)

    Object Number: 662008  Size: SH
  57. Remove the retaining ring for the 6th gear.

  58. Object Number: 662009  Size: SH
  59. Remove the following components from the countershaft (4):
  60. 33.1. The thrust washer (1)
    33.2. The 6th gear (2)
    33.3. The 6th gear bearing (3)

    Object Number: 663713  Size: SH
  61. Remove the bolts for the shift interlock plate.
  62. Let the shift interlock plate rest on the shift shafts.

  63. Object Number: 662010  Size: SH
  64. Install the J 44730  (2) to the J 44707  (1).
  65. Important: You will be using the intermediate case to pull off the 6th gear synchronizer hub and the 6th gear bushing. Ensure the J 44730 is properly located on the intermediate case.

  66. Install the J 44730  (2) on the intermediate case as shown. The J 44730 needs to be aligned in order for the J 44707 to be centered on the mainshaft.
  67. Using the J 44730  (2) and the J 44707  (1) on the countershaft, remove the 6th gear synchronizer hub and 6th gear bushing.
  68. • The intermediate case will slide off the 2nd/3rd shift shaft and the 4th/5th shift shaft.
    • Keep the shift shafts straight in order to ensure the intermediate case does not bind on the shift shafts.
    • If the intermediate case starts to bind on the shift shafts, stop pulling.
    • Straighten the shift shafts in the intermediate case and continue pulling.

    Object Number: 662012  Size: SH
  69. Remove the 6th gear bearing race (1).
  70. Remove the 6th gear synchronizer assembly (2).

  71. Object Number: 662019  Size: SH
  72. Remove the intermediate case from the mainshaft and the countershaft.

  73. Object Number: 724133  Size: SH
  74. Remove the 6th gear spacer from the countershaft.

  75. Object Number: 663680  Size: SH
  76. Remove the 2nd/3rd shift fork and shaft, the 4th/5th shift fork and shaft, and the shift interlock plate from the mainshaft assembly.

  77. Object Number: 662020  Size: SH
  78. Remove the countershaft from the mainshaft by walking the countershaft away.

Tools Required

    • J 8614-01 Flange and Pulley Holding Tool
    • J 23907 Slide Hammer
    • J 36825 Output Shaft Oil Seal Remover - 4WD Models Only
    • J 44707 T-Bar Push Puller
    • J 44725 Gear Pack Assembly Fixture
    • J 44726 2/3 Jaw Puller
    • J 44730 Intermediate Case Puller Legs
    • J 45278 Seal Remover
    • J 45279 Assembly Stand

    Object Number: 811334  Size: SH
  1. Remove the drain plug and drain the transmission fluid. Ensure all of the fluid is drained.
  2. If the transmission is equipped with a power take-off (PTO), remove the PTO.

  3. Object Number: 811343  Size: SH
  4. Remove the 6 bolts holding the quill tube to the front of the transmission.
  5. Remove the quill tube.

  6. Object Number: 811352  Size: SH
  7. Using the J 23907  (1) and the J 45278  (2), remove the input shaft seal.

  8. Object Number: 811340  Size: SH
  9. Install the J 45279 to the front of the transmission.
  10. Tip the transmission up on the J 45279 .

  11. Object Number: 811355  Size: SH
  12. Remove the shift control housing bolts.
  13. Remove the shift control housing assembly.

  14. Object Number: 811357  Size: SH
  15. Remove the clutch cable bracket bolts and the bracket.

  16. Object Number: 811358  Size: SH
  17. Using the J 8614-01 , loosen the propeller shaft yoke nut. Use 2 3/8 inch NF bolts to hold the J 8614-01 to the propeller shaft yoke.

  18. Object Number: 811362  Size: SH

    Important: 

       • The transmission may have a 4 bolt parking brake drum/yoke assembly or an 8 bolt parking brake/drum assembly. The disassembly procedures to remove the drum/yoke assembly are the same.
       • The parking brake drum does not require removal from the propeller shaft yoke for transmission disassembly or assembly.
       • If removing the parking brake drum, and using the drum again, the drum to yoke requires alignment mark for assembling. The original drum and yoke come as a balanced assembly.

  19. Remove the propeller shaft yoke nut and discard.

  20. Object Number: 811364  Size: SH
  21. Remove the parking brake drum/yoke assembly.

  22. Object Number: 811440  Size: SH
  23. Remove the bolts retaining the parking brake shoe bracket to the rear case.
  24. Remove, as an assembly, the parking brake shoes, bracket, and cam lever.

  25. Object Number: 811447  Size: SH
  26. Remove the bolts retaining the parking brake cable bracket.
  27. Remove the parking brake cable bracket.

  28. Object Number: 811452  Size: SH
  29. Remove the bolt retaining the vehicle speed sensor (VSS).
  30. Remove the VSS and the O-ring seal.
  31. Remove and discard the O-ring seal.

  32. Object Number: 661234  Size: SH
  33. Remove the shift shaft detent sleeve and the shift shaft detent plunger.

  34. Object Number: 811458  Size: SH
  35. Remove the 19 bolts retaining the rear case to the front case.

  36. Object Number: 811463  Size: SH

    Notice:  Do not nick, scratch or damage the sealing surface. The sealing surface is a machined surface. Damage to the machined surface can cause leakage.

    Important: Do not separate the rear case from the intermediate case by using a pry bar between the cases.

  37. Remove the rear case.
  38. • Use a soft-face hammer and hit up on the rear case.
    • The cases should come apart once the sealer is broken.
    • There are 2 dowel pins that may bind in the rear case.
    • The mainshaft rear bearing is a slip fit in the rear case and may bind if the case is not lifted up straight.

    Object Number: 661237  Size: SH
  39. Remove the 2 bolts for the intermediate case.

  40. Object Number: 661238  Size: SH
  41. Install the S-hooks in the webbing of the intermediate case to the locations shown.
  42. Attach a suitable chain to the S-hooks.


    Object Number: 661239  Size: SH
  43. Using a suitable lifting device, carefully remove the gear assembly from the front case.

  44. Object Number: 661249  Size: SH

    Important: The weight of the gear assembly is extended over the edge of the workbench. The weight may tip over or overload a standard metal work bench.

  45. Secure the J 44725  (1) to a sturdy workbench.
  46. Position the gear assembly on the J 44725 .

  47. Object Number: 661258  Size: SH

    Notice: When removing the roll pins from the shift shafts use a punch that is a slightly smaller diameter than the roll pin. Flaring of the shift shaft groove may occur if the punch binds. This will result in extra effort to remove the shift forks or shift control levers. When double roll pins are used, remove both of the roll pins at the same time. Support the shift component when removing the roll pins to prevent damage to the shift shafts. Do not reuse the roll pins after removal.

  48. Using a hammer and punch, remove the roll pins from the internal shift control rear lever.

  49. Object Number: 661975  Size: SH
  50. Remove the internal shift control rear lever.

  51. Object Number: 661262  Size: SH
  52. Using a hammer and a punch, remove the roll pins for the internal shift control front lever.

  53. Object Number: 662001  Size: SH
  54. Remove the internal shift control front lever.
  55. 32.1. Turn the internal shift control front lever in order to clear the 2nd/3rd shift fork and the 4th/5th shift fork.
    32.2. Remove the shift shaft with the internal shift control front lever.

    Object Number: 661994  Size: SH
  56. Using the J 36825  (1) and the J 23907  (2), remove the 4 shift shaft detent plugs.

  57. Object Number: 661996  Size: SH

    Important: Only remove the plungers as needed, for replacement.

  58. Remove the shift shaft detent springs and the shift shaft detent plungers. The plungers should only be removed if replacing the plungers. The plungers may be hard to come out now. After removing the shift shafts, the plungers will be easier to remove.

  59. Object Number: 811466  Size: SH

    Notice: When removing the roll pins from the shift shafts use a punch that is a slightly smaller diameter than the roll pin. Flaring of the shift shaft groove may occur if the punch binds. This will result in extra effort to remove the shift forks or shift control levers. When double roll pins are used, remove both of the roll pins at the same time. Support the shift component when removing the roll pins to prevent damage to the shift shafts. Do not reuse the roll pins after removal.

    Important: The 4th/5th shift fork and the 2nd/3rd shift fork do not require removal from the shift shafts for transmission disassembly. Do not remove the roll pins from the 4th/5th shift fork and the 2nd/3rd shift fork unless replacing the shift forks or the shift shafts.

  60. Remove the following roll pins:
  61. • The 6th gear shift fork (1)
    • The 1st/reverse gear shift fork (2)

    Object Number: 811471  Size: SH
  62. Remove the 6th gear shift fork and shaft.
  63. 36.1. Move the interlock plate in the 6th gear position by moving the plate towards the 1st/reverse shift shaft.
    36.2. Pull up on the shift shaft while tapping down on the shift fork with a soft-face hammer.
    36.3. Remove the shift fork and shaft from the 6th gear synchronizer assembly.

    Object Number: 811476  Size: SH
  64. Remove the 1st/reverse shift fork and shaft.
  65. 37.1. Move the interlock plate in the reverse gear shift position by moving the plate towards the 6th gear shift shaft.
    37.2. Pull up on the shift shaft while tapping down on the shift fork with a soft-face hammer.
    37.3. Remove the shift fork and shaft from the 1st/reverse gear synchronizer hub.

    Object Number: 811483  Size: SH
  66. Using the J 44726 , remove the gears from the mainshaft.

  67. Object Number: 811488  Size: MH
  68. Remove the following components from the mainshaft:
  69. 39.1. The speed sensor reluctor wheel (1)
    39.2. The mainshaft rear bearing (2)
    39.3. The reverse gear thrust washer (3)
    39.4. The reverse gear (4)
    39.5. The reverse gear bearings (5)
    39.6. The reverse gear bushing (6)
    39.7. The reverse gear synchronizer blocking ring (7)
    39.8. The 1st/reverse synchronizer assembly (8)
    39.9. The 1st gear synchronizer blocking ring (9)
    39.10. The 1st gear (10)
    39.11. The 1st gear bearings (11)

    Object Number: 662008  Size: SH
  70. Remove the retaining ring for the 6th gear.

  71. Object Number: 662009  Size: SH
  72. Remove the following components from the countershaft (4):
  73. 41.1. The thrust washer (1)
    41.2. The 6th gear (2)
    41.3. The 6th gear bearing (3)

    Object Number: 663713  Size: SH
  74. Remove the bolts for the shift interlock plate.
  75. Let the shift interlock plate rest on the shift shafts.

  76. Object Number: 662010  Size: SH
  77. Install the J 44730  (2) to the J 44707  (1).
  78. Important: Use the intermediate case to pull off the 6th gear synchronizer hub and the 6th gear bushing. Ensure the J 44730 is properly located on the intermediate case.

  79. Install the J 44730  (2) on the intermediate case as shown. The J 44730 needs to be aligned in order for the J 44707 to be centered on the mainshaft.
  80. Using the J 44730  (2) and the J 44707  (1) on the countershaft, remove the 6th gear synchronizer hub and 6th gear bushing.
  81. • The intermediate case will slide off the 2nd/3rd shift shaft and the 4th/5th shift shaft.
    • Keep the shift shafts straight to ensure the intermediate case does not bind on the shift shafts.
    • If the intermediate case starts to bind on the shift shafts, stop pulling.
    • Straighten the shift shafts in the intermediate case again, and continue pulling.

    Object Number: 662012  Size: SH
  82. Remove the 6th gear bearing race (1).
  83. Remove the 6th gear synchronizer assembly (2).

  84. Object Number: 662019  Size: SH
  85. Remove the intermediate case from the mainshaft and the countershaft.

  86. Object Number: 724133  Size: SH
  87. Remove the 6th gear spacer from the countershaft.

  88. Object Number: 663680  Size: SH
  89. Remove the 2nd/3rd shift fork and shaft, the 4th/5th shift fork and shaft, and the shift interlock plate from the mainshaft assembly.

  90. Object Number: 662020  Size: SH
  91. Remove the countershaft from the mainshaft by walking the countershaft away.