Removal Procedure
Tools Required
• | J 5239 Connecting
Rod Bolt Guide Set |
• | J 24270 Cylinder
Bore Ridge Reamer |
- Remove the cylinder head(s). Refer to
Cylinder Head Replacement
.
- Use
the following procedure in order to remove the ring ridge, as necessary:
2.1. | Turn the crankshaft until the piston is at the bottom of its stroke. |
2.2. | Place a cloth on top of the piston. |
2.3. | Use the J 24270
in
order to remove the piston ring ridge. |
2.4. | Turn the crankshaft so that the piston is at the top of its stroke. |
2.5. | Remove the cloth and cutting debris. |
- Raise and suitably support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Remove the oil pan. Refer to
Oil Pan Replacement
.
- Remove the oil pump. Refer to
Oil Pump Replacement
.
- Remove the crankshaft oil deflector. Refer to
Crankshaft Oil Deflector Replacement
.
- Turn the crankshaft until the piston and rod assembly to be serviced
is at Bottom Dead Center (BDC).
Important: Place matchmarks or numbers on the connecting
rod and connecting rod caps. The connecting rod caps must be assembled to their original
connecting rod.
- Remove the connecting rod nuts.
- Remove the connecting rod cap.
- Remove the lower connecting rod bearing.
Notice: Install thread protector in order to avoid damage to the crankshaft
journal.
- Install the J 5239
.
- Push the piston and rod up through the cylinder.
- Lower the vehicle.
- Remove
the connecting rod, upper connecting rod bearing and piston out of the top of the
engine block.
- Wipe oil from the connecting rod bearings and crankshaft connecting rod
journal.
- Inspect the connecting rod bearings. Refer to
Piston, Connecting Rod, and Bearing Cleaning and Inspection
.
- Inspect the connecting rod cap and connecting rod. Refer to
Piston, Connecting Rod, and Bearing Cleaning and Inspection
.
- Inspect the crankshaft connecting rod journal. Refer to
Crankshaft and Bearing Cleaning and Inspection
.
- Clean the cylinder bores with a light honing.
- Clean the cylinder bores with hot water and detergent.
- Swab the bores with a clean, dry cloth.
- Swab the bores with new engine oil and a clean, dry cloth.
Installation Procedure
Tools Required
• | J 5239 Connecting
Rod Bolt Guide Set |
• | J 8037 Piston
Ring Compressor |
- Coat the piston, the piston rings, the cylinder bore, and the bearing
surfaces with new engine oil.
- Install the J 5239
.
- Compress the piston rings using the J 8037
.
- When
installing the piston and connecting rod assembly, the stamped arrow on the piston
must point to the front of the engine while the flange on the connecting rod must
face toward the front of the piston on the left hand, and face toward the rear
of the piston on the right hand.
- Install the piston into its original bore
using the J 5239
and the J 8037
and lightly tapping the top
of the piston with a wooden hammer handle.
- Firmly hold the J 8037
against the engine block until all of the piston rings have entered the cylinder
bore.
- Raise and suitably support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Install the upper connecting rod bearing into the connecting rod.
- Coat the inside surfaces of the upper connecting rod bearing with new
engine oil.
- Using the J 5239
pull
the piston and rod assembly down to the crankshaft.
- Remove the J 5239
.
- Install the lower connecting
rod bearing into the connecting rod cap.
- Coat the inside surfaces of the lower connecting rod bearing with new
engine oil.
- Install the connecting rod cap.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the connecting rod cap nuts.
Tighten
Tighten the connecting rod nuts to 20 N·m
(15 lb ft). Use the J 36660-A
in order to rotate the nuts an additional 75 degrees.
- Inspect the connecting rod for a binding by prying back and forth with
a suitable tool. If necessary, loosen and retighten the connecting rod cap.
- Measure
the connecting rod clearance using the following procedure:
17.1. | Install all connecting rod bearings. |
17.2. | Lightly tap each connecting rod parallel to the crankpin in order to
make sure the connecting rods have clearance. |
17.3. | Measure the side clearance between the connecting rod caps using a feeler
gage, or dial indicator. Refer to Crankpin (Rod Side Clearance) in
Engine Mechanical Specifications
for the connecting rod side clearance. |
- Install the crankshaft oil deflector. Refer to
Crankshaft Oil Deflector Replacement
.
- Install the oil pump. Refer to
Oil Pump Replacement
.
- Install the oil pan. Refer to
Oil Pan Replacement
.
- Lower the vehicle.
- Install the cylinder head(s). Refer to
Cylinder Head Replacement
.