Removal Procedure
- Remove the air cleaner and duct assembly. Refer to
Air Cleaner Assembly Replacement
in Engine Controls
- 3.1L.
- Recover the refrigerant. Refer to
Refrigerant Recovery and Recharging
- Disconnect the ABS modulator electrical connector.
- Disconnect the electrical connector from the A/C pressure sensor
switch.
- Remove the liquid/suction
line bracket.
- Remove the liquid line
nut (1) at the orifice.
Important: If the expansion (orifice) tube is restricted or plugged, remove the
expansion (orifice) tube.
- Remove the impacted residues.
- Using a heat gun (hair dryer, epoxy dryer or the equivalent),
apply heat approximately one inch from the dimples on the inlet pipe. Do not
overheat the pipe.
- While applying heat, perform the following steps:
9.1. | Use needle-nose pliers in order to grip the orifice tube. |
9.2. | Use a turning motion along with a push-pull motion in order to
loosen the impacted orifice tube. |
9.3. | Remove the orifice tube. |
- Add 30 ml (1 oz) of Polyalkylene Glycol (PAG) Synthetic
Refrigerant Oil to the system.
- Lubricate the new expansion (orifice) tube and O-ring seal with
mineral base 525 viscosity refrigerant oil and insert into the inlet pipe.
- Install tube with the smaller screen (3) first.
- Remove the O-rings seals (2).
Installation Procedure
Important: Coat the new O-ring seals (2) with mineral base 525 viscosity
refrigerant oil.
- Install the new O-ring seals (2).
Install the new expansion (orifice) tube with the shorter screen (3)
end in first.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the liquid
line nut (1) at the orifice.
Tighten
Tighten the liquid line nut to 27 N·m (20 lb ft).
- Install the liquid/suction
line bracket.
- Connect the electrical connector from the A/C pressure sensor
switch.
- Connect the ABS modulator electrical connector.
- Evacuate and charge the A/C system. Refer to
Refrigerant Recovery and Recharging
- Test the system for leaks. Refer to
Leak Testing
- Install the air cleaner and duct assembly. Refer to
Air Cleaner Assembly Replacement
in Engine Controls
- 3.1L.