Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
Important: A short to ground will cause an open fuse(s). Before performing this diagnostic procedure, inspect the fuse(s) for an open. | ||||
1 |
Does the test lamp light? | -- | Go to Step 2 | Go to Step 3 |
2 | Connect a test lamp between terminal B and terminal A of the hazard switch connector. Does the test lamp light? | -- | Go to Step 4 | Go to S tep 5 |
3 | Backprobe the left IP wiring harness junction block connector C1 with a test lamp between terminal C12 and ground. Does the test lamp light? | -- | Go to Step 6 | Go to Step 7 |
4 | Replace the hazard switch. Refer to Hazard Flasher Switch Replacement in Instrument Panel, Gauges and Console. Is the repair complete? | -- | -- | |
5 | Repair the open in CKT 150 between the hazard switch and ground splice pack G201. Refer to Wiring Repairs Is the repair complete? | -- | -- | |
6 | Repair the open in CKT 1140 between the hazard switch and the left IP wiring harness junction block. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
7 | Replace the left IP wiring harness junction block. Refer to Relay/Fuse Center Replacement in Wiring Systems. Is the repair complete? | -- | -- |
Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
Important: A short to ground will cause an open fuse(s). Before performing this diagnostic procedure, inspect the fuse(s) for an open. | ||||
1 |
Does the test lamp flash? | -- | ||
2 | Replace the hazard switch. Refer to Hazard Warning Switch in Instrument Panel, Gauges and Console. Is the repair complete? | -- | -- | |
3 | Repair the open in CKT 15 or CKT 14 between the hazard switch and the respective (right or left) IP wiring harness junction block. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- |