Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
1 | Was the Instrument Cluster Diagnostic System Check performed? | -- | ||||||
2 | Verify proper operation of all of the turn lamps. Do all of the turn lamps operate properly? | -- | ||||||
3 | Repair any inoperative turn lamps. Refer to Turn Signal Lamps Inoperative - Hazard Lamps Operate . Is the repair complete? | -- | -- | |||||
4 |
Does the resistance measure within the specified range? | 0-2 ohms | ||||||
5 | Replace the BCM. Refer to the following procedures:
Is the repair complete? | -- | -- | |||||
6 | Repair the open in CKT 16 between terminal A8 of BCM connector C2 and terminal D of the turn/headlamp switch assembly. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- |