The 1-2 shift solenoid (SS) valve controls fluid flow acting on the 1-2 shift valve. The solenoid is a normally-open valve that, in conjunction with the 2-3 shift solenoid (SS) valve, allows four different shifting combinations. Refer to Shift Solenoid Valve State and Gear Ratio . The 1-2 SS valve is attached to the control valve body within the transmission.
The solenoid receives ignition voltage through the fused power feed circuit. The powertrain control module (PCM) commands the solenoid ON or OFF by providing a ground path.
When the PCM detects a continuous open, short to ground, or short to voltage in the 1-2 SS valve circuit, then DTC P0753 sets. DTC P0753 is a type A DTC.
This diagnostic procedure supports the following DTC:
DTC P0753 1-2 Shift Solenoid Control Circuit
The ignition switch is in the ON position.
One of the following conditions occurs for 4.3 seconds:
• | The PCM commands the solenoid ON, and the voltage feedback remains high, B+. |
• | The PCM commands the solenoid OFF, and the voltage feedback remains low, 0 volts. |
• | The PCM illuminates the malfunction indicator lamp (MIL). |
• | The PCM commands maximum line pressure. |
• | The PCM inhibits 3-2 downshifts above 52 km/h (32 mph). |
• | The PCM freezes transmission adaptive functions. |
• | The PCM records the operating conditions when the Conditions for Setting the DTC are met. The PCM stores this information as Freeze Frame and Failure Records. |
• | The PCM stores DTC P0753 in PCM history. |
• | The PCM turns OFF the MIL during the third consecutive trip in which the diagnostic test runs and passes. |
• | A scan tool can clear the MIL/DTC. |
• | The PCM clears the DTC from PCM history if the vehicle completes 40 warm-up cycles without an emission-related diagnostic fault occurring. |
• | The PCM cancels the DTC default actions when the ignition switch is OFF long enough in order to power down the PCM. |
Ensure the wiring harness is not stretched too tightly or other components are pressing on the connector body. Also, inspect for proper clearance to any other components and wiring. Refer to Testing for Intermittent Conditions and Poor Connections .
The numbers below refer to the step numbers on the diagnostic table.
This step tests the electrical operation of the solenoid.
This step tests the PCM and the wiring to the transmission.
This step verifies that the circuit has the correct resistance.
Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
1 | Did you perform the Diagnostic System Check - Vehicle? | -- | Go to Step 2 | |||||
2 |
Important: Before clearing the DTC, use the scan tool in order to record the Freeze Frame and Failure Records. Using the Clear Info function erases the Freeze Frame and Failure Records from the PCM. Is DTC P0758 or DTC P2761 also set? | -- | Go to Step 3 | Go to Step 8 | ||||
3 |
Refer to Circuit Protection - Fuses . Did you find the condition? | -- | Go to Step 4 | Go to Step 6 | ||||
4 |
Important: The condition that affects this circuit may exist in other connecting branches of the circuit. Refer to Power Distribution Schematics for complete circuit distribution. Test the ignition 1 voltage circuit of the 1-2 SS valve for a short to ground between the underhood junction block and the AT inline 20-way connector. Refer to Testing for Short to Ground and Wiring Repairs . Did you find and correct the condition? | -- | Go to Step 26 | Go to Step 5 | ||||
5 |
Important: The condition that affects this circuit may exist in other connecting branches of the circuit. Refer to Power Distribution Schematics for complete circuit distribution. Test the ignition 1 voltage circuit of the 1-2 SS valve for a short to ground between the AT inline 20-way connector and the 1-2 SS valve. Refer to Testing for Short to Ground . Did you find the condition? | -- | Go to Step 23 | -- | ||||
6 | Test the ignition 1 voltage circuit of the 1-2 SS valve for an open between the underhood junction block and the AT inline 20-way connector. Refer to Testing for Continuity and Wiring Repairs . Did you find and correct the condition? | -- | Go to Step 26 | Go to Step 7 | ||||
7 | Test the ignition 1 voltage circuit of the 1-2 SS valve for an open between the AT inline 20-way connector and the 1-2 SS valve. Refer to Testing for Continuity . Did you find the condition? | -- | Go to Step 23 | -- | ||||
Does the solenoid click when commanded ON and OFF? | -- | Go to Testing for Intermittent Conditions and Poor Connections | Go to Step 9 | |||||
Refer to Automatic Transmission Inline 20-Way Connector End View . Is the test lamp ON when you command the solenoid ON, and OFF when you command the solenoid OFF? | -- | Go to Step 17 | Go to Step 10 | |||||
10 | Is the test lamp always ON? | -- | Go to Step 11 | Go to Step 13 | ||||
11 |
Is the test lamp ON? | -- | Go to Step 12 | Go to Step 25 | ||||
12 | Test the control circuit of the 1-2 SS valve for a short to ground between the PCM connector C3 and the AT inline 20-way connector. Refer to Testing for Short to Ground and Wiring Repairs . Did you find and correct the condition? | -- | Go to Step 26 | -- | ||||
13 | Is the test lamp always OFF? | -- | Go to Step 14 | -- | ||||
14 | Test the control circuit of the 1-2 SS valve for an open between the PCM connector C3 and the AT inline 20-way connector. Refer to Testing for Continuity and Wiring Repairs . Did you find and correct the condition? | -- | Go to Step 26 | Go to Step 15 | ||||
15 | Connect a test lamp from the 1-2 SS valve control circuit of the J 44152 to ground. Refer to Automatic Transmission Inline 20-Way Connector End View . Is the test lamp ON? | -- | Go to Step 16 | Go to Step 25 | ||||
16 | Test the control circuit of the 1-2 SS valve for a short to voltage between the PCM connector C3 and the AT inline 20-way connector. Refer to Testing for a Short to Voltage and Wiring Repairs . Did you find and correct the condition? | -- | Go to Step 26 | -- | ||||
Refer to Automatic Transmission Inline 20-Way Connector End View . Is the resistance within the specified range? | 19-31 ohms | Go to Step 20 | Go to Step 18 | |||||
18 | Is the resistance greater than the specified value? | 31 ohms | Go to Step 19 | Go to Step 20 | ||||
19 |
Refer to Testing for Continuity . Did you find a condition? | -- | Go to Step 23 | Go to Step 24 | ||||
20 | Measure the resistance from the 1-2 SS valve control circuit of the J 44152 to ground. Refer to Automatic Transmission Inline 20-Way Connector End View . Is the resistance less than the specified value? | 1,000 ohms | Go to Step 21 | Go to Step 22 | ||||
21 | Test the control circuit of the 1-2 SS valve for a short to ground between the AT inline 20-way connector and the 1-2 SS valve. Refer to Testing for Short to Ground . Did you find the condition? | -- | Go to Step 23 | -- | ||||
22 | Measure the resistance between the 1-2 SS valve control circuit and all other terminals, except the ignition 1 voltage circuit, the 2-3 SS valve control circuit, and the TCC PWM solenoid valve control circuit of the J 44152 . Refer to Automatic Transmission Inline 20-Way Connector End View . Is the resistance less than the specified value? | 1,000 ohms | Go to Step 23 | Go to Step 24 | ||||
23 | Replace the automatic transmission wiring harness. Refer to Wiring Harness Replacement . Did you complete the replacement? | -- | Go to Step 26 | -- | ||||
24 | Replace the 1-2 SS valve. Refer to 1-2 Shift Solenoid Valve Replacement . Did you complete the replacement? | -- | Go to Step 26 | -- | ||||
25 | Replace the PCM. Refer to Control Module References for replacement, set-up, and programming. Did you complete the replacement? | -- | Go to Step 26 | -- | ||||
26 | Perform the following procedure in order to verify the repair:
Has the test run and passed? | -- | Go to Step 27 | Go to Step 2 | ||||
27 | With the scan tool, observe the stored information, capture info and DTC info. Does the scan tool display any DTCs that you have not diagnosed? | -- | System OK |