GM Service Manual Online
For 1990-2009 cars only

Generator Replacement LZ4

Removal Procedure

Important: Service the generator as a complete unit.


    Object Number: 1239071  Size: SH
  1. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  2. Remove the drive belt. Refer to Drive Belt Replacement .
  3. Remove the generator electrical connections.
  4. Remove the generator mounting nuts and bolts.
  5. Remove the generator.

Installation Procedure

    Notice: Refer to Fastener Notice in the Preface section.


    Object Number: 1239071  Size: SH
  1. Install the generator .
  2. Tighten

        • Tighten the bolts to 50 N·m (37 lb ft).
        • Tighten the nuts to 30 N·m (22 lb ft).
  3. Install the generator electrical connections.
  4. Install the drive belt. Refer to Drive Belt Replacement .
  5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .

Generator Replacement LY7

Removal Procedure


    Object Number: 1394044  Size: SH
  1. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  2. Reposition the positive battery cable boot at the generator terminal.
  3. Remove the positive battery cable nut at the generator.
  4. Remove the positive battery cable terminal from the generator.

  5. Object Number: 1394065  Size: SH
  6. Disconnect the engine harness electrical connector from the generator.
  7. Remove the drive belt. Refer to Drive Belt Replacement .

  8. Object Number: 1394079  Size: SH
  9. Remove the idler pulley. Refer to Drive Belt Idler Pulley Replacement .
  10. Remove the generator bolts.
  11. Important: When removing the generator from the vehicle, it may be necessary to maneuver the generator to remove it from the vehicle.

  12. Remove the generator.

Installation Procedure


    Object Number: 1394079  Size: SH
  1. Position the generator to the engine.
  2. Loosely install the generator bolts.
  3. Install the idler pulley. Refer to Drive Belt Idler Pulley Replacement .
  4. Notice: Refer to Fastener Notice in the Preface section.

  5. Tighten the generator bolts in the sequence shown.
  6. Tighten
    Tighten the bolts to 50 N·m (37 lb ft).


    Object Number: 1394065  Size: SH
  7. Install the drive belt. Refer to Drive Belt Replacement .
  8. Connect the engine harness electrical connector to the generator.

  9. Object Number: 1394044  Size: SH
  10. Install the positive battery cable terminal to the generator.
  11. Install the positive battery cable nut at the generator.
  12. Tighten
    Tighten the nut to 20 N·m (15 lb ft).

  13. Position the positive battery cable boot at the generator terminal.
  14. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .

Generator Replacement LE5

Removal Procedure


    Object Number: 1578426  Size: SH
  1. Disconnect negative battery cable. Refer to Battery Negative Cable Disconnection and Connection.
  2. Remove the drive belt. Refer to Drive Belt Replacement.
  3. Disconnect the generator electrical connector (1).
  4. Reposition the rubber boot (3).
  5. Remove the engine harness terminal lead to generator nut (2).
  6. Remove the engine harness terminal (4) from the generator stud.

  7. Object Number: 2094845  Size: SH
  8. Remove the generator fasteners (1,3, 4).
  9. Remove the generator.

Installation Procedure


    Object Number: 2094845  Size: SH
  1. Position the generator to the engine block.
  2. Install the generator fasteners (4) loosely.
  3. Notice: Refer to Fastener Notice in the Preface section.

  4. Install the fastener (1) and tighten to 10 N·m (89 lb in).
  5. Install the fastener (3) and tighten to 22 N·m (16 lb ft).
  6. Tighten the fasteners (4) to 22 N·m (16 lb ft).

  7. Object Number: 1578426  Size: SH
  8. Install the engine harness terminal (4) to the generator stud.
  9. Install the engine harness terminal lead to generator nut (2) and tighten to 20 N·m (15 lb ft).
  10. Position the rubber boot (3) over the stud.
  11. Connect the generator electrical connector (1).
  12. Install the drive belt. Refer to Drive Belt Replacement.
  13. Connect negative battery cable. Refer to Battery Negative Cable Disconnection and Connection.