Front Compartment Front Rail Replacement Laminated Steel Dash
Removal Procedure
Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
Caution: Refer to Foam Sound Deadeners Caution in the Preface section.
Important:
• | Model year 2005 and prior vehicles are not manufactured with laminated steel in front of the dashes. Therefore the front lower rail can be MIG welded instead of the rivet and bonding process as stated in these instructions. |
• | Failure to follow this procedure will compromise the structural integrity of the vehicle. |
Important: The front of the dash panel is formed from laminated steel. This steel is constructed by bonding 2 pieces of cold rolled steel (1) with a viscoelastic layer of adhesive (2). Metal inert gas (MIG)
welding laminated steel does not meet GM Corporate standards for structural integrity. As an alternative, all factory welds will be replaced by using the rivet and adhesive bond method described in the installation portion of this procedure. The rivet and adhesive
bond method must only be used in the areas as described in this procedure.
- Disable the SIR system. Refer to
SIR Disabling and Enabling .
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection .
Caution: Refer to Collision Sectioning Caution in the Preface section.
- Remove all related panels and components.
- Repair as much of the damage as possible.
- Remove the sealers and the anti-corrosion materials from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair .
- Note the number and location of the factory welds for installation of the full rail service part.
Important: Drill through the rail flange only. Do NOT drill into the dash panel or the inner reinforcements.
- Using an 8-mm (5/16-in) spot weld remover, locate and drill out the factory welds on the weld flange connecting the lower rail to the dash panel.
- From the passenger compartment, locate and drill out the remaining factory weld.
- Remove the full rail.
Installation Procedure
- Drill 8-mm (5/16-in) plug weld holes in the service front lower rail in the location noted from the original rail.
- Prepare the plug weld mating surfaces, as necessary.
- Apply 3M® Weld-Thru Coating P/N 05913 or equivalent to the plug weld mating surfaces.
- Position the service rail to the vehicle using three-dimensional measuring equipment.
- Clamp the rail in place.
- Using a 7-mm (17/64-in) bit, drill the rivet attachment holes through the service rail and the dash panel in the exact locations as noted from the factory rail.
Important: If the location of the original plug weld holes cannot be determined, space the plug weld holes every 40 mm (1.5 in) apart.
- Remove the service rail.
- Prepare the plug weld mating surfaces, as necessary.
- Apply 3M® Weld-Thru Coating P/N 05913 or equivalent to the plug weld mating surfaces.
- Prepare the bond mating areas by grinding the body mating and the service part flanges to bare steel. Do NOT damage the corners or thin the metal during the grinding process.
Important:
• | Do NOT allow the adhesive to cure prior to installation of the front rail side extension. |
• | Note the necessary location for installation of a 14-mm (17/32-in) long rivet. |
- Clean the mating surfaces.
Important: The adhesive has a 40-50 minute working time. Do NOT allow the adhesive to cure prior to installing the service rail.
- Apply a 3-6 mm (1/8 to 1/4 in) bead of metal panel bonding adhesive GM P/N 12378567 (Canadian P/N 88901675) or equivalent to both of the mating surfaces.
- Using a small acid brush, spread a coat of adhesive to both of the mating surfaces. Cover all of the bare metal to ensure corrosion protection.
- Apply a 3-6 mm (1/8 to 1/4 in) bead of metal panel bonding adhesive GM P/N 12378567 (Canadian P/N 88901675) or equivalent to the mating surface of the service rail.
Important: Do NOT pull the rail off of the dash after adhesion. To align the parts, slide the rail against the front of the dash.
- Position the service rail to the vehicle using three-dimensional measuring equipment.
- Clamp the rail in place.
Important: Verify proper positioning of the service rail prior to riveting and welding.
- Install the 9 mm (11/32 in) long rivets so that the rivet head contacts the passenger compartment side of the dash.
- Install the 14-mm (17/32-in) long rivet so that the rivet head contacts the passenger compartment side of the dash, extending through the front rail and through the rail side extension.
- Remove the excess adhesive from the rail area.
- Plug weld the remaining holes accordingly.
- Clean and prepare all of the welded surfaces.
- Install the front wheelhouse assembly. Refer to
Front Wheelhouse Replacement .
- Install the radiator support assembly. Refer to
Upper Rail Replacement .
- Apply the sealers and anti-corrosion materials to the repaired area, as necessary. Refer to
Anti-Corrosion Treatment and Repair .
- Paint the repaired area. Refer to
Basecoat/Clearcoat Paint Systems .
- Install all of the related panels and components.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection .
- Enable the SIR system. Refer to
SIR Disabling and Enabling .
Front Compartment Front Rail Replacement Steel Dash
Removal Procedure
Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
- Disable the SIR system. Refer to
SIR Disabling and Enabling .
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection .
Important: This assembly is replaced at factory seams.
- Remove all related panels and components.
- Repair as much of the damage as possible. Refer to
Dimensions - Body .
- Remove the sealers and anti-corrosion materials from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair .
Important: Note the number and location of the factory welds for installation of the full rail service part.
- Locate and drill out all the necessary factory welds.
- Remove the full rail.
Installation Procedure
Important: If the location of the original plug weld holes can not be determined, space the plug weld holes every 40 mm (1½ in) apart.
- Drill 8 mm (5/16 in) plug weld holes in the service part as necessary in the locations noted from the original panel.
- Prepare all mating surfaces as necessary.
- Apply 3M Weld-Thru Coating P/N 05916 or equivalent to all mating surfaces.
- Position the full rail service part to the vehicle using 3-dimensional measuring equipment. Clamp the rail in place.
- Plug weld accordingly.
- Clean and prepare all of the welded surfaces.
- Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair .
- Paint the repaired area. Refer to
Basecoat/Clearcoat Paint Systems .
- Install all of the related panels and components.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection .
- Enable the SIR system. Refer to
SIR Disabling and Enabling .