Control Assembly Replacement C60
Removal Procedure
- Remove the I/P trim plate. Refer to
Instrument Panel Cluster Trim Plate Bezel Replacement
in Instrument Panel,
Gauges and Console.
- Remove the front floor console if equipped. Refer to
Front Floor Console Replacement
in Instrument
Panel, Gauges and Console.
- Remove the retaining bolts
from the HVAC control assembly.
- Pull the control assembly out from the instrument panel.
- Disconnect the electrical
connectors (1) and the vacuum connectors (2) from the HVAC control assembly.
- Remove the HVAC control assembly.
Installation Procedure
- Connect the electrical
connectors (1) and the vacuum connectors (2) to the HVAC control assembly.
- Install the HVAC control
assembly into the instrument panel.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the retaining
bolts to secure the HVAC control assembly.
Tighten
Tighten the control assembly bolts to 1.8 N·m (16 lb
in).
- Install the I/P trim plate. Refer to
Instrument Panel Cluster Trim Plate Bezel Replacement
in Instrument Panel,
Gauges and Console.
- Install the front floor console if equipped. Refer to
Front Floor Console Replacement
in Instrument
Panel, Gauges and Console.
Control Assembly Replacement CJ3
Removal Procedure
- Remove the I/P trim plate. Refer to
Instrument Panel Cluster Trim Plate Bezel Replacement
in Instrument Panel,
Gauges and Console.
- Remove the front floor console if equipped. Refer to
Front Floor Console Replacement
in
Instrument Panel, Gauges and Console.
- Remove the retaining bolts
from the HVAC control assembly.
- Pull the control assembly out from the instrument panel.
- Disconnect the electrical
connectors (1) and the vacuum connectors (2) from the HVAC control assembly.
- Remove the HVAC control assembly.
Installation Procedure
- Connect the electrical
connectors (1) and the vacuum harness (2) to the HVAC control assembly.
- Install the HVAC control
assembly into the instrument panel.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the retaining
bolts to secure the HVAC control assembly.
Tighten
Tighten the control assembly bolts to 1.8 N·m (16 lb
in).
- Install the I/P trim plate. Refer to
Instrument Panel Cluster Trim Plate Bezel Replacement
in Instrument Panel,
Gauges and Console.
- Install the front floor console if equipped. Refer to
Front Floor Console Replacement
in Instrument
Panel, Gauges and Console.