GM Service Manual Online
For 1990-2009 cars only

Heater Pipes Replacement RPO LS4

Tools Required

J 38185 Hose Clamp Pliers

Removal Procedure

  1. Remove the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
  2. Drain the cooling system. Refer to Cooling System Draining and Filling .

  3. Object Number: 1524231  Size: SH
  4. Release and reposition the heater inlet and outlet hose clamps using the J 38185 .
  5. Important: Cap or plug the cooling components to prevent system contamination.

  6. Remove the heater hoses from heater pipes.
  7. Notice: Do not apply excessive force on the heater core pipes during hose removal. Applying excessive force on the heater core pipes may damage the heater core pipes.


    Object Number: 1524232  Size: SH
  8. Remove the heater pipe assembly retaining bolts from the rear the of engine.

  9. Object Number: 1524235  Size: SH
  10. Remove the heater pipe assembly retaining bolt from the front of the engine.
  11. Release and reposition the heater pipe hose clamps at the engine using the J 38185 .
  12. Remove the heater pipe hoses from the engine.
  13. Remove the heater pipe assembly from the vehicle.

Installation Procedure


    Object Number: 1524235  Size: SH
  1. Using a lint-free clean, dry cloth, carefully clean the sealing surfaces of the heater pipe assembly at the engine and heater hoses.
  2. Install the heater pipe assembly into position in the vehicle.
  3. Install the heater pipe hoses to the engine.
  4. Reposition and release the heater pipe hose clamps at the engine using the J 38185 .
  5. Loosely install the heater pipe assembly retaining bolt to the front of the engine.
  6. Notice: Refer to Fastener Notice in the Preface section.


    Object Number: 1524232  Size: SH
  7. Install the heater pipe assembly retaining bolts to the rear of the engine.
  8. Tighten
    Tighten all the heater pipe assembly bolts to 16 N·m (12 lb ft).


    Object Number: 1524231  Size: SH
  9. Connect heater hoses to the heater pipe assembly.
  10. Install the heater hose clamps into position using the J 38185 .
  11. Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
  12. Fill the cooling system. Refer to Cooling System Draining and Filling .

Heater Pipes Replacement RPOs LZE, LZ4, LZ8


Object Number: 1608037  Size: MF

Callout

Component Name

Preliminary Procedures

  1. Drain the cooling system. Refer to Cooling System Draining and Filling .
  2. Remove heater inlet hose from the heater pipe assembly. Refer to Heater Inlet Hose Replacement .
  3. Remove heater outlet hose from the heater pipe assembly. Refer to Heater Outlet Hose Replacement .
  4. Remove the air cleaner duct. Refer to Air Cleaner Resonator Outlet Duct Replacement .

1

Heater Inlet and Outlet Pipe Assembly Nut - Left

Notice: Refer to Fastener Notice in the Preface section.

Tighten
10 N·m (89 lb in)

2

Heater Inlet and Outlet Pipe Assembly - Left

Tip
Using the J 38185 disconnect the left heater pipe assembly from the front heater pipe assembly.

3

Heater Inlet and Outlet Pipe Assembly Bolt - Front

Tighten
25 N·m (18 lb in)

4

Heater Inlet and Outlet Pipe Assembly Stud - Front

Tighten
10 N·m (89 lb in)

5

Heater Inlet and Outlet Pipe Assembly - Front