Notice: Refer to Fastener Notice in the Preface section.
- Install the line pressure measurement plug.
Tighten
Tighten the plug to 20 N·m (15 lb ft).
- Install the baffle plate and the baffle plate bolts.
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Install the oil filter and the oil filter bolt.
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Install the paper gasket.
- Install the metal gasket.
- Install the torque converter housing.
- Install the torque converter bolts and hand tighten in the following order: 7, 20, 12, 16, and 4.
- Final tighten the bolts.
Tighten
Tighten the bolts to 15 N·m (11 lb ft).
- Hand tighten the remaining bolts in the following order: 15, 3, 14, 5, 13, 22, 11, 21, 10, 9, 19, 8, 18, 17, 6, 1, and 2.
- Final tighten all the bolts.
Tighten
Tighten the bolts to 23 N·m (17 lb ft)