- Remove the 14 bolts.
- Remove the lower valve body cover (1).
- Turn the assembly over.
- Remove the 12 bolts that attach the upper valve body cover (1)
to the upper valve body (5).
- Remove the governor oil
strainer, gaskets and the plate. Replace if necessary.
- Turn the assembly over.
- Remove the 3 bolts from the lower valve body cover (10).
- Remove the lower valve body cover (10) from the lower valve
body (9).
Important: Do NOT allow the check valve and the check ball to fall out of the lower
valve body.
- Remove the lower valve body (9), the plate (7), and the
gaskets (6, 8) as a unit.
Hold the valve body plate
to the lower valve body.
Upper Valve Body Overhaul
Tools Required
J 26900-6 Dial Caliper
Notice: When disassembling the valve body halves, keep all valve springs, spring
seats and plugs within their respective valves. Most valve springs are of
different sizes and CANNOT be interchanged. Verify that all parts
are clean and dry before assembly.
- Remove the vibrating stopper (3) from the upper
valve body (5).
- Remove the throttle valve assembly by removing the following components:
• | The throttle valve cam assembly (4) |
| Important: Count the number of adjusting rings prior to removal because the number
of adjusting rings determines the throttle pressure. You must install the
same number of rings that you removed in order to ensure proper
transaxle shift points. Some valve bodies do not require adjusting
rings.
|
• | The adjusting rings (2) |
• | The throttle valve spring (1) |
- Remove the throttle modulator
valve assembly from the upper valve body (1) by removing the following
components:
• | The throttle modulator valve plug (8) |
• | The throttle modulator valve (9) |
• | The throttle modulator valve spring (10) |
- Remove the accumulator control valve assembly from the upper valve
body by removing the following components:
• | The accumulator control valve plug (5) |
• | The accumulator control valve spring (6) |
• | The accumulator control valve (7) |
- Remove the low coast modulator valve assembly from the upper valve
body by removing the following components:
• | The low coast modulator valve plug (4) |
• | The low coast modulator valve spring (3) |
• | The low coast modulator valve (2) |
- Remove the throttle valve
assembly from the upper valve body (1) by removing the following components:
• | The throttle valve sleeve (4) |
• | The downshift plug spring (6) |
- Remove the 2nd coast modulator valve assembly from the upper valve
body by removing the following components:
• | The 2nd coast modulator valve spring (3) |
• | The 2nd coast modulator valve (2) |
- Remove the cut-back valve
assembly from the upper valve body (1) by removing the following components:
• | The cut-back valve plug (7) |
- Remove the lock-up relay valve assembly from the upper valve body
by removing the following components:
• | The lock-up relay valve plug (6) |
• | The lock-up relay valve (5) |
• | The lock-up relay valve spring (4) |
• | The lock-up relay valve sleeve (2) |
- Clean all components thoroughly with solvent. Dry the components.
- Inspect all valves for cracks, scoring, or other damage. Replace
as necessary.
- Inspect all valve springs for damage or distortion. Replace as
necessary.
- Inspect the upper valve body bores for scoring or cracks. Replace
as necessary.
- Measure the free length and the outer coil diameter of all of
the upper valve body valve springs using J 26900-6
. Replace any spring whose length does not meet the specification.
Upper Valve Body Assembly Procedure
Tools Required
J 36850 Transmission
Assembly Lubricant
Important: Use J 36850
or equivalent
in order to retain the installed components.
- Install the following components of the lock-up relay valve assembly
onto the upper valve body (1):
• | The lock-up relay valve sleeve (2) |
• | The lock-up relay valve spring (4) |
• | The lock-up relay valve (5) |
• | The lock-up relay valve plug (6) |
- Install the following components of the cut-back valve assembly
onto the upper valve body:
• | The cut-back valve plug (7) |
- Install the following
components of the 2nd coast modulator valve assembly onto the upper valve
body (1):
• | The 2nd coast modulator valve (2) |
• | The 2nd coast modulator valve spring (3) |
- Install the following components of the throttle valve assembly
onto the upper valve body:
• | The downshift plug spring (6) |
• | The throttle valve sleeve (4) |
- Install the following
components of the low coast modulator valve assembly onto the upper valve
body (1):
• | The low coast modulator valve (2) |
• | The low coast modulator valve spring (3) |
• | The low coast modulator valve plug (4) |
- Install the following components of the accumulator control valve
assembly onto the upper valve body:
• | The accumulator control valve (7) |
• | The accumulator control valve spring (6) |
• | The accumulator control valve plug (5) |
- Install the following components of the throttle modulator valve
assembly onto the upper valve body:
• | The throttle modulator valve spring (10) |
• | The throttle modulator valve (9) |
• | The throttle modulator valve plug (8) |
- Install the following
components of the throttle valve assembly onto the upper valve body (5):
• | The throttle valve spring (1) |
| Important: Count the number of adjusting rings prior to removal because the number
of adjusting rings determines the throttle pressure. You must install the
same number of rings that you removed in order to ensure
proper transaxle shift points. Some valve bodies do not
require adjusting rings.
|
• | The adjusting rings (2) |
• | The throttle valve cam assembly (4) |
- Install the vibrating stopper (3) onto the upper valve
body. Secure with 1 bolt.
Tighten
Tighten the cam bolt to 10 N·m (89 lb in).
- Verify the locations of
the throttle valve retainers (1).
- Install the check ball (2).
Lower Valve Body Overhaul Procedure
Tools Required
J 26900-6 Dial Caliper
Notice: When disassembling the valve body halves, keep all valve springs, spring
seats and plugs within their respective valves. Most valve springs are of
different sizes and CANNOT be interchanged. Verify that all parts
are clean and dry before assembly.
- Remove the 3 check balls (1).
- Remove the secondary regulator valve assembly from the lower valve
body (2) by removing the following components:
• | The secondary regulator valve plug (14) |
• | The secondary regulator valve (13) |
• | The secondary regulator valve spring (12) |
- Remove the low coast shift valve assembly from the lower valve
body by removing the following components:
• | The low coast shift valve plug (11) |
• | The low coast shift valve (10) |
• | The low coast shift valve spring (9) |
- Remove the intermediate shift valve assembly from the lower valve
body by removing the following components:
• | The intermediate shift valve plug (8) |
• | The intermediate shift valve (7) |
• | The intermediate shift valve spring (6) |
- Remove the lock-up signal valve assembly from the lower valve
body by removing the following components:
• | The lock-up signal valve plug (5) |
• | The lock-up signal valve (4) |
• | The lock-up signal valve spring (3) |
- Remove the pressure relief
valve assembly from the lower valve body (1) by removing the following
components:
• | The pressure relief valve (2) |
• | The pressure relief valve spring (5) |
- Remove the cooler bypass valve assembly from the lower valve body
by removing the following components:
• | The cooler bypass valve (3) |
• | The cooler bypass valve spring (4) |
- Remove the 2-3 shift valve assembly from the lower valve body
by removing the following components:
• | The 2-3 shift valve plug (17) |
• | The 2-3 shift valve (18) |
- Remove the detent regulator valve assembly from the lower valve
body by removing the following components:
• | The detent regulator valve plug (16) |
• | The detent regulator valve (15) |
• | The detent regulator valve spring (14) |
- Remove the 1-2 shift valve assembly from the lower valve body
by removing the following components:
• | The 1-2 shift valve plug (13) |
• | The 1-2 shift lower valve (12) |
• | The 1-2 shift upper valve (11) |
- Remove the primary regulator valve assembly from the lower valve
body by removing the following components:
• | The primary regulator valve sleeve (10) |
• | The primary regulator valve plunger (9) |
• | The primary regulator valve spring (8) |
• | The primary regulator valve (6) |
- Clean all components thoroughly with solvent. Dry the components.
- Inspect all valves for cracks, scoring, or other damage. Replace
as necessary.
- Inspect all valve springs for damage or distortion. Replace as
necessary.
- Inspect the upper valve body bores for scoring or cracks. Replace
as necessary.
- Measure the free length and the outer coil diameter of all of
the lower valve body valve springs using J 26900-6
. Replace any spring whose length does not meet the specification.
Lower Valve Body Assembly Procedure
Tools Required
J 36850 Transmission
Assembly Lubricant
Important: Use J 36850
or equivalent
in order to retain the installed components.
- Install the components of the primary regulator valve assembly onto
the lower valve body (1):
• | The primary regulator valve (6) |
• | The primary regulator valve spring (8) |
• | The primary regulator valve plunger (9) |
• | The primary regulator valve sleeve (10) |
- Install the components of the 1-2 shift valve assembly onto the
lower valve body:
• | The 1-2 shift upper valve (11) |
• | The 1-2 shift lower valve (12) |
• | The 1-2 shift valve plug (13) |
- Install the components of the detent regulator valve assembly
onto the lower valve body:
• | The detent regulator valve spring (14) |
• | The detent regulator valve (15) |
• | The detent regulator valve plug (16) |
- Install the components of the 2-3 shift valve assembly onto the
lower valve body:
• | The 2-3 shift valve (18) |
• | The 2-3 shift valve plug (17) |
- Install the components of the cooler bypass valve assembly onto
the lower valve body:
• | The cooler bypass valve spring (4) |
• | The cooler bypass valve (3) |
- Install the components of the pressure relief valve assembly onto
the lower valve body:
• | The pressure relief valve spring (5) |
• | The pressure relief valve (2) |
- Install the components
of the lock-up signal valve assembly onto the lower valve body (2):
• | The lock-up signal valve spring (3) |
• | The lock-up signal valve (4) |
• | The lock-up signal valve plug (5) |
- Install the components of the intermediate shift valve assembly
onto the lower valve body :
• | The intermediate shift valve spring (6) |
• | The intermediate shift valve (7) |
• | The intermediate shift valve plug (8) |
- Install the components of the low coast shift valve assembly onto
the lower valve body:
• | The low coast shift valve spring (9) |
• | The low coast shift valve (10) |
• | The low coast shift valve plug (11) |
- Install the components of the secondary regulator valve assembly
onto the lower valve body:
• | The secondary regulator valve spring (12) |
• | The secondary regulator valve (13) |
• | The secondary regulator valve plug (14) |
- Install the 3 check balls (1).
Valve Body Installation
- Install the lower valve
body and the plate (as a unit) on the upper valve body.
- Install the following components onto the lower valve body (1):
• | Install the gasket containing the
larger (2) cooler by-pass valve hole to the lower valve body. |
- Place the following components on the lower valve body:
- Place another new gasket onto the plate.
- Align each bolt hole in the valve body with the 2 gaskets
and the plate.
- Install the following components on the top of the upper valve
body:
• | The gasket with the plate |
- Hold the following components securely so the components do not
separate:
- Align each bolt hole in the valve bodies with the following components:
- Install the valve body
bolts.
- Finger tighten the 3 bolts.
- Turn the assembly over.
- Finger tighten the three 28 mm (1.102 in) bolts
in the upper valve body.
- Install the following
components:
• | The upper valve body cover new gaskets |
- Turn the assembly over.
- Install the following components:
• | The lower valve body cover |
- Install the cover over
a new gasket.
- Finger tighten the 14 bolts on the valve body cover.
• | The 4 bolts measure 45 mm (1.771 in)
in length. |
• | The 10 of the bolts (the remainder) measure 16 mm
(3/4 in) in length. |
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Tighten the upper and lower valve body bolts.
Tighten
Tighten the lower valve body bolts to 5.5 N·m (49 lb in).
- Recheck the alignment of the gaskets
- Turn the assembly over.
- Tighten the bolts of the upper valve body.
Tighten
Tighten the upper valve body bolts to 5.5 N·m (49 lb in).
- Install the governor oil strainer.
- Install the valve body to the transaxle.