Tools Required
J 8037 Piston Ring
Compressor
- Install the connecting
rod bearings. Use the proper size bearings.
1.1. | Install the bearing inserts into the connecting rod and the connecting
rod cap. |
1.2. | Lubricate the connecting rod bearings with engine oil. |
- Install the piston and
the connecting rod to the correct bore.
2.1. | Slide a piece of 9.5 mm (0.375 in) fuel or vacuum
hose over the connecting rod bolts. This protects the crankshaft journal during
piston and connecting rod installation. |
2.2. | Stagger each piston ring end gap equally around the piston. |
2.3. | Lubricate the piston and the piston rings with engine oil. |
2.4. | Install J 8037
over
the piston. Do not disturb the piston ring end gap location. |
2.5. | The piston must be installed so that the mark on the top of the
piston faces the front of the engine. |
2.6. | Place the piston in its matching bore. |
2.7. | Tap the piston into its bore with a hammer handle. Guide the connecting
rod to the connecting rod journal while tapping the piston into place. |
2.8. | Hold the J 8037
against
the engine block until all the rings have entered the cylinder bore. |
2.9. | Remove the vacuum hose from the connecting rod bolts. |
Important: Ensure that the connecting rod cap is properly oriented on the connecting
rod. The tab on the connecting rod should be oriented toward the left (exhaust
manifold) side of the engine.
- Install the connecting
rod cap.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the connecting
rod bolt nuts.
Tighten
- Tighten the connecting rod bolt nuts to 52 N·m (38 lb ft).
- Loosen the connecting rod bolt nuts 1 full turn.
- Tighten the connecting rod bolt nuts to 52 N·m (38 lb ft).
- Measure the connecting
rod side clearance with a feeler gauge.
The correct clearance is 0.10-0.38 mm (0.0039-0.0149 in).