Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Exterior Lights System Check? | -- | Go to Step 2 | |
2 | Inspect the FR PRK fuse in the UBEC. Is the fuse open? | -- | Go to Step 5 | Go to Step 3 |
3 |
Does either bulb have an open or shorted filament? | -- | Go to Step 4 | Go to Step 6 |
4 | Replace the defective bulb. Is the repair complete? | -- | -- | |
5 | Locate and repair the short to ground in CKT 2309 (BRN). Is the repair complete? | -- | -- | |
6 | Locate and repair the open in CKT 2309 (BRN). Is the repair complete? | -- | -- |