Note the location and remove the sealers and anti-corrosion
materials from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair
in Paint and Coatings.
Important: Do not damage any inner panels or reinforcements.
Locate and drill out all factory welds. Note the number and location of welds
for installation of the header panel.
Using a grinder
or an equivalent tool, remove the MIG welds on each end of the header.
Verify the existence
of structural weld-through adhesive. Refer to
Structure Adhesive Identification
. If necessary use a chisel to separate the
outer header panel from the inner header panel.