Note the location and remove the sealers and anti-corrosion materials
from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair
in Paint and Coatings.
Important: Do not damage any inner panels or reinforcements.
Locate and drill out all factory welds. Note the number and location of welds
for installation of the front upper rail.
Verify the existence of structural weld-through adhesive. Refer to
Structure Adhesive Identification
. If necessary use
a chisel to separate the front upper rail from the adjacent panels.