Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:• | Identify how to disable high voltage. |
• | Identify how to test for the presence of high voltage. |
• | Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures must be followed. |
Note: The aid of an assistant may be helpful in holding the engine harness up out of the way so the upper intake manifold cover does not get caught against the engine harness.
Note: Lift evenly on both sides of the fuel rail until all injectors are removed from their bores.
Note: Push down firmly on both sides of the rail until all the injectors have been seated into their bores.
Caution: Refer to Fastener Caution in the Preface section.
Tighten
Tighten the bolts to 10 N·m (89 lb in).
Tighten
Tighten the bolts/nuts to 10 N·m (89 lb in).
Note: The aid of an assistant may be helpful in holding the engine harness up out of the way so the upper intake manifold cover does not get caught against the engine harness.
Tighten
• | Tighten the bolts a first pass in the sequence shown to 5 N·m (44 lb in). |
• | Tighten the bolts a final pass in the sequence shown to 10 N·m (89 lb in). |
Tighten
Tighten the bolt to 9 N·m (80 lb in).
Tighten
Tighten the nut to 5 N·m (44 lb in).