Important:
• Before assembly, wash all the components thoroughly. • Apply AT fluid to all of the components and holes. • Do not use components which may have been dropped. • With plastic tape, tape the screwdrivers and rods to be used for inserting
the valve. • Note the orientation of valves and plugs.