GM Service Manual Online
For 1990-2009 cars only
Makes
🢒
Chevrolet
🢒
2008
🢒
Uplander
🢒
Transmission/Transaxle
🢒
Automatic Transaxle - 4T65-E
🢒 1-2 Shift Solenoid Valve Replacement
Removal Procedure
Remove the case side cover. Refer to
Control Valve Body Cover Replacement
.
Disconnect the transaxle wiring harness.
Remove the 1-2 shift solenoid (315A).
Installation Procedure
Install the 1-2 shift solenoid (315A).
Connect the transaxle wiring harness.
Install the case side cover. Refer to
Control Valve Body Cover Replacement
.