GM Service Manual Online
For 1990-2009 cars only

Special Tools

    • J 35910 Drive Axle Seal Clamp Pliers
    • J 8059 Snap Ring Pliers

Disassemble Procedure


    Object Number: 860858  Size: SH
  1. Install the wheel drive shaft in a soft jawed vise.

  2. Object Number: 2008294  Size: SH

    Notice: Do not cut through the wheel drive shaft inboard or outboard boot during service. Cutting through the boot may damage the sealing surface of the housing and the tripot or the constant velocity joint bushing. Damage to the sealing surface may lead to water and dirt intrusion and premature wear of the constant velocity joint.

  3. Using a hand grinder, remove and discard the swage clamp (4) from the boot (3).
  4. Using a pair of side cutters, remove and discard the outer boot clamp (2) from the boot (3).

  5. Object Number: 891620  Size: SH
  6. Using a hammer, a block of wood or a brass punch, remove the outer joint from the wheel drive shaft.

  7. Object Number: 233593  Size: SH
  8. Using the J 8059 , remove the inner (constant velocity) CV joint retaining ring (2) from the wheel drive shaft (1).

  9. Object Number: 2008315  Size: SH
  10. Remove the CV joint boot (1) from the wheel drive shaft (2).
  11. Remove all the grease from the CV joint and the wheel drive shaft.
  12. Inspect the CV joint for excessive wear or defective components. Refer to Wheel Drive Shaft Outer Joint Inspection.

Assembly Procedure


    Object Number: 2008315  Size: SH
  1. Install the new clamp and boot (1) and the wheel drive shaft (1).

  2. Object Number: 2008321  Size: SH
  3. Ensure that the boot (1) is properly seated in the groove (2) on the wheel drive shaft (3).
  4. Install the wheel drive shaft in the soft jawed vise.

  5. Object Number: 214026  Size: SH
  6. Using the J 35910 , breaker bar, and a torque wrench, close clamp to specifications.
  7. Tighten
    Tighten the clamp to 136 N·m (100 lb ft).


    Object Number: 233593  Size: SH
  8. Install the inner retaining ring (2)  on the wheel drive shaft (1).

  9. Object Number: 2008345  Size: SH

    Important: The CV joint should just touch the inner retaining ring.

  10. Using a block of wood and a hammer, install the outer CV joint on the wheel drive shaft.

  11. Object Number: 174625  Size: SH
  12. Place approximately half of the grease from the service kit in the CV joint and in the boot.
  13. Important: Ensure that the clamp is properly aligned


    Object Number: 245263  Size: SH
  14. Install the outer boot and clamp (1) on the outer housing.
  15. Using the J 35910 with a breaker bar (3) and a torque wrench (2), close clamp to specifications.
  16. Tighten
    Tighten the clamp to 174 N·m (130 lb ft).

    Important: If the gap does not read 1.9 mm (5/64 inch), continue to tighten the clamp until the specification is met.

  17. Measure the gap (A) in the clamp. The gap should be 1.9 mm (5/64 inch).
  18. Rotate the outer joint several times to equally distribute the grease in the CV joint and the boot.